    THE DIRECTION

    STRATEGIC PLANNING PROCESS

    2009 - 2014

    http://www.glendalewaterandpower.com/default.aspx
  • 8/13/2019 GWP Strategy Presentation

    2/28

    The Big Picture

    Before we built our plan,

    we examined the big picture

    We discussed how majortrends could impact thestakeholders in GWPsmarketplace over the next fiveyears.

    We charted the major threats

    and opportunities that thesestakeholders could create inour marketplace.

  • 8/13/2019 GWP Strategy Presentation

    3/28

    We identified trends INCREASING WORLDWIDE ECONOMIC UNCERTAINTY

    INCREASING GROWTH IN CALIFORNIA AND THE WORLD

    HIGHER STANDARD OF LIVING AND SERVICES

    INCREASING CONCERN FOR HUMAN HEALTH AND THE ENVIRONMENT

    INCREASING CLIMATE CHANGE

    SMALLER WORKFORCE SHIFTING TO NEW ECONOMY

    INCREASING SAFETY AND SECURITY

    INCREASING MAINTENANCE, REPAIR, OR REPLACEMENT OF INFRASTRUCTURE

  • 8/13/2019 GWP Strategy Presentation

    4/28

    We identified stakeholders

  • 8/13/2019 GWP Strategy Presentation

    5/28

    Major Future Opportunities

    1. Our customers conserve more water and energy

    2. Customers utilize more recycled water and solar

    3. Customers use real-time information through AMI4. GWP gains more green energy to reduce carbon

    footprint

    5. GWP sells more power outside the City

    6. GWP reduces its peak loads

    7. GWP receives positive publicity and support

    8. Joint resource projects increase GWPs access topower supplies

    9. Advanced technologies provide new efficiencies and

    solutions to GWP while creating potential new business

  • 8/13/2019 GWP Strategy Presentation

    6/28

    We decided that our plan mustconsider thesepriorities1. WATER SUPPLY

    Maximize the production of local water resources andthe efficiency of water use

    2. POWER SUPPLYEnsure reliable power supply under severelegislative/regulatory controls and restrictions througha portfolio of resources that includes a reconfiguredGrayson Power Plant

    3. CUSTOMER SERVICEAchieve high customer satisfaction level by increasingthe value of all GWP programs and services

    4. RATESAchieve water and electric rates that are at the medianof comparable utilities in Southern California

    5. AGING INFRASTRUCTUREAssure the highest achievable service reliability bycontinuously improving and maintaining the GWPphysical plant, electric and water facilities

  • 8/13/2019 GWP Strategy Presentation

    7/28

    Plan priorities

    6. WORK FORCEHire, develop, and retain a safe, highly skilled,dedicated, and customer-focused work force

    7. SYSTEMSUtilize new and existing information systems

    and technologies that reduce GWPs costs,enhance customer service, and increaseoperational effectiveness

    8. CITY OF GLENDALECollaboration to improve both the Citys andGWPs efficiency and public image

    9. LEGISLATION AND REGULATIONInfluence local, state, and federal legislationand regulations to benefit GWP's operations

  • 8/13/2019 GWP Strategy Presentation

    8/28

    THE GWP DIRECTION

    Mission

    Vision

    Values Key Result Areas

    Goals

    Initiatives Scoreboard

  • 8/13/2019 GWP Strategy Presentation

    9/28

    To be your trusted

    community utility

    Our MissionDescription of the successes GWP will have achieved at the end of 5 years

  • 8/13/2019 GWP Strategy Presentation

    10/28

    Our VisionDescription of the successes GWP will have achieved at the end of 5 years

    To deliver reliable, high quality,

    environmentally-sensitive,

    and sustainable

    water and power servicesto our customers

    in a caring and

    cost-competitive manner,

    while creating a stimulating

    and rewarding work experience

    for our employees

  • 8/13/2019 GWP Strategy Presentation

    11/28

    Our ValuesPrinciples and beliefs that are the bedrock for GWPs existence and the decision criteria

    for major programs, policies, and expenditures

    Dedication to customer

    service

    Trustworthy andrespectful

    Ownership

    Teamwork

    Do it right!

    Continuous improvement

  • 8/13/2019 GWP Strategy Presentation

    12/28

    Key Result AreasThe performance areas where GWP must achieve measurable success over the next 5 years

    WATER SUPPLY

    POWER SUPPLY

    CUSTOMER SERVICE

    RATES

    WATER INFRASTRUCTURE

    POWER INFRASTRUCTURE

    WORKFORCE

    SYSTEMS

    CITY OF GLENDALE

    LEGISLATION & REGULATION

  • 8/13/2019 GWP Strategy Presentation

    13/28

    GoalsMeasurable targets that describe the components of excellence in each GWP Key Result Area (KRA)

    KRA: WATER SUPPLY1. Produce 3,856 AFY from Verdugo

    Basin by 2014

    2. Serve 2,500 AFY recycled waterby 2013

    3. Institute a 2.5% PBC-like chargeto fund water conservationmeasures by Dec 2010

    4. Reduce water usage by 7% over2006 base year by 2014

    KRA: POWER SUPPLY1. Reduce electrical usage by 7%

    by 2014

    2. Increase GPP efficiency to

  • 8/13/2019 GWP Strategy Presentation

    14/28

  • 8/13/2019 GWP Strategy Presentation

    15/28

    GoalsMeasurable targets that describe the components of excellence in each GWP Key Result Area (KRA).

    KRA: POWERINFRASTRUCTURE

    1. Reduce number of outages to

    less than 25 per year by June2. Upgrade transmission system

    to 69 kV by June 2014

    3. Convert distribution feedersfrom 4 kV to 12 kV by 2020

    4. Replace all electromechanicalrelays with state-of-the-artrelays by 2018

    5. Implement effective assetmanagement by 2013

    KRA: WATERINFRASTRUCTURE

    1. Reduce unaccounted-for

    water to 5% by June 20112. Replace all small metersinstalled before 2004 by June2011

    3. Replace/rehabilitate 25 milesof pipe by 2014

    4. Implement effective assetmanagement by 2013

  • 8/13/2019 GWP Strategy Presentation

    16/28

    GoalsMeasurable targets that describe the components of excellence in each GWP Key Result Area (KRA).

    KRA: WORKFORCE

    1. Continually improve jobsatisfaction of our employees

    beginning Nov 20092. Increase annual workforce

    availability to 87% by 2014

    3. Have

  • 8/13/2019 GWP Strategy Presentation

    17/28

    GoalsMeasurable targets that describe the components of excellence in each GWP Key Result Area (KRA).

    KRA: CITY OF GLENDALE1. Improve communications with customers,

    City Council, and City Departmentsbeginning Nov 2009

    2. Determine optimum value of transfer to

    provide mutual benefits to City and GWP by2014

    3. Implement communications vehicles toimprove GWPs public image beginning2011

    4. Implement new collaborative ventures withCity departments beginning Dec 2011

    KRA: LEGISLATION &REGULATION

    1. Continue compliance with state andfederal regulatory requirements

    beginning Feb 20092. Establish and continue on-going

    relationships with state and federallegislators and regulators beginningJan 2010

    3. Develop specific GWP legislative

    strategy and initiatives beginningJune 2010

    4. Provide quarterly reports on majoractivities and successes beginningJan 2010

  • 8/13/2019 GWP Strategy Presentation

    18/28

    KRA 1 WATER SUPPLY 2009 2010 2011 2012 2013 2014

    GOAL 1.1 Produce 3,856 AFY from Verdugo Basin Kavounas Sep Dec

    INITIATIVE 1.1.1 Mo' wells Takidin Foothill well in-service Sep

    Rockhaven well in-service Jun"Other" well in-service Jun

    INITIATIVE 1.1.2 BAM Better Asset Management) Kavounas Hire advisor/business consultant JunIn house training Oct

    Create asset register DecCIP validation Mar

    Maintenance procedures/automation Jun

    Operations manual/documentation Dec

    GOAL 1.2 Serve 2,500 AFY recycled water Kavounas Jan Dec

    INITIATIVE 1.2.1 RW to the max Takidin Expansion Master Plan Jun

    Financial analysis Dec

    Ordinance modification JunDesign and build projects Jan

    GOAL 1.3 Institute a 2.5% PBC-like charge to fund water conservation measures Kavounas Dec

    INITIATIVE 1.3.1 Redoing Water Rates Kavounas Financial analysis Jun

    Ordinance modification Dec

    GOAL 1.4 Reduce water usage by 7 percent over 2006 base year Bassin Jun Dec

    INITIATIVE 1.4.1 Water Is Life, Don't Waste It Kuennen Market water savings programs to save 1% per year Jun

    Enhance/modify water savings programs to improve savings Dec

    KRA 2 POWER SUPPLY 2009 2010 2011 2012 2013 2014

    GOAL 2.1 Reduce electrical usage by 7% Bassin Jun Dec

    INITIATIVE 2.1.1 Save a Little, Save a Lot Kuennen Market energy efficiency programs to save 1% per year Jun Jun Jun Jun Jun Jun

    Enhance/modify EE programs to improve savings Dec Dec Dec Dec Dec Dec

    GOAL 2.2 Increase GPP effic iency to

  • 8/13/2019 GWP Strategy Presentation

    19/28

    KRA 3 CUSTOMER SERVICE 2009 2010 2011 2012 2013 2014

    GOAL 3.1 Consistently achieve above average customer satisfaction scores from th Vallier Dec

    INITIATIVE 3.1.1 Customer Contact Surveys Benson Conduct quarterly customer contact survey JunINITIATIVE 3.1.2 GWP Customer Surveys Kuennen Conduct GWP annual customer surveys Oct Oct Oct Oct Oct OctINITIATIVE 3.1.3 Customer Service Training Cline Provide 4-6 hours customer focused training / year Dec Dec Dec Dec Dec DecINITIATIVE 3.1.4 Migration of Trouble Orders to CIS Herman System Set-up Jun

    Training Jul

    GOAL 3.2 Ensure that all affected customers and public are consistently notified of Bassin DecINITIATIVE 3.2.1 Mass Notification System Kuennen Implement system Oct

    Arrange for no tification of plan ned o utage s NovArrange for no tification of unp lanned o utage s and est. time o f

    restorationDec

    GOAL 3.3 Restore minor power outages within 10 minutes and major outages within Abueg Jan Dec

    INITIATIVE 3.3.1 SCADA System Germond Factory Acceptance Test Feb

    Delivery Apr RFP for Installation FebInstallation Contract Award Mar

    Installation SepSite Acceptance Test / Implementation Oct

    INITIATIVE 3.3.2 Fiber SONET Installation Germond Delivery FebInstall Apr Test and Commission May

    INITIATIVE 3.3.3 Fuse Coordination on Feeders Abrari No. 6 Montrose Jun No. 8 Montrose Jun

    No. 7 Scholl DecNo. 7 Columbus DecNo. 2 Western JunNo. 9 Tropico Jun

    INITIATIVE 3.3.4 Glorietta Substation Upgrade Abrari Comple te prequalification of bidders Mar Submit RFP to Council Mar

    Community meeting Mar CEQA JunConstruction Oct

    Operate upgraded substation MayINITIATIVE 3.3.5 Grandview Substation Upgrade Abrari Start design Sep

    Comple te studies and specifications JunConstruction OctOperate upgraded substation May

    INITIATIVE 3.3.6 Disturbance Monitors Installation Abrari Operate upgraded Kellogg Dec Operate upgraded Rossmoyne Jun

    INITIATIVE 3.3.7 Outage Management System Abueg Prepare specifications Jul Vendor se lection Dec

    Delivery and installa tion JunImplementation Jul

    GWP STRATEGY MONITORING WORKSHEET

  • 8/13/2019 GWP Strategy Presentation

    20/28

    KRA 4 RATES 2009 2010 2011 2012 2013 2014

    GOAL 4.1 Establish water rates at or below 80% of the average rates in the area Kavounas Dec

    INITIATIVE

    4.1.1 Redoing Water Rates Kavounas Financial analysis Jun JunOrdinance modification Dec DecINITIATIVE 4.1.2 BAM (Better Asset Management) Kavounas Hire advisor/business consultant Jun

    In house training OctCreate asset register Dec

    CIP validation Mar

    Maintenance procedures/automation Jun

    Operations manual/documentation Dec

    GOAL 4.2 Reduce electrical rates to 35% below SCE Steiger Jan Dec

    INITIATIVE 4.2.1 Renegotiate Scholl Canyon Gas Steiger Engage principals in negotiation Jan

    Develop long-term strategy for landfill gas Mar

    Litigate existing contract JunRetire associated Grayson units Dec

    INITIATIVE 4.2.2 Alternative Use for Landfill Steiger Initiate feasib ility study Jun

    Create political/community support Jun

    Implement trash to energy project Dec

    INITIATIVE 4.2.3 PGE Contract Reconfiguration Lins Litigate existing contract JanINITIATIVE 4.2.4 Transfer Stabilization at 2008 Levels Steiger Finalize rate analysis Sep

    Implement public education programs DecINITIATIVE 4.2.5 GWP Revenue Increase Steiger Finalize portfolio study Sep

    Operate trading group with new metr ics JanINITIATIVE 4.2.6 Customer Service Cost Plan Davis Bill and collect cost allocation for services Dec

    GOAL 4.3 Increase annual electrical wholesale revenue to $10M Lins Jan Dec

    INITIATIVE 4.3.1 Project Optimize Lins Review historical performance May

    C ata lo gu e a ll h ist orica l a nd kn own tra din g s tr ate gi es Ju l

    Input all strategies into metrics model JanDecision on wholesale vs. retail allocation Jan

    Acquire al l necessary t rading tools and staff Jul

    Wholesale net trading revenue $3 Million Jan

    Wholesale net trading revenue $5 Million JanWholesale net trading revenue $10 Million Dec

    GOAL 4.4 Reduce electrical system losses to

  • 8/13/2019 GWP Strategy Presentation

    21/28

    KRA 5 WATER INFRASTRUCTURE 2009 2010 2011 2012 2013 2014

    GOAL 5.1 Reduce unaccounted-for water to 5% Kavounas Jul Jun

    INITIATIVE 5.1.1 (BAM) Better Asset Management Kavounas Hire advisor/business consultant Jun

    In house training Oct

    Create asset register DecCIP validation Mar

    Main tenance procedures/automation JunOperations manual/documentation Dec

    INITIATIVE 5.1.2 Fix the Pipes Hayes Re-issue CIP Mar Design and build projects Jul

    GOAL 5.2 Replace all small meters installed befo re 2004 Vallier Oct JunINITIATIVE 5.2.1 AMI Fully Implemented Kuennen Award AMI installation contract Sep

    AMI fully impleme nted Oct Dec

    GOAL 5.3 Replace/rehabilitate 25 miles of pipe Kavounas Jul Jun

    INITIATIVE 5.3.1 Fix the Pipes Hayes Re-issue CIP Mar

    Design & build projects Jul

    GOAL 5.4 Implement effective asset management Kavounas DecINITIATIVE 5.4.1 BAM (Better Asset Management) Kavounas Hire advisor/business consultant Jun

    In house training Oct

    Create asset register DecCIP validation Mar Main tenance procedures/automation Jun

    Operations manual/documentation DecINITIATIVE 5.4.2 City-wide GIS Herman Hire GWP GIS professional Aug

    Award RFP c ontra ct to p opu late GIS with GWP system Dec

    Implement full GIS use Dec

    GWP STRATEGY MONITORING WORKSHEET

  • 8/13/2019 GWP Strategy Presentation

    22/28

    KRA 6 POWER INFRASTRUCTURE 2009 2010 2011 2012 2013 2014

    GOAL 6.1 Reduce number of outages to less than 25 per year Abueg Jun Jun

    INITIATIVE 6.1.1 SCADA System Germond Factory Acceptance Test Feb

    Delivery Apr RFP for installation FebInstallation contract award Mar Installation Sep

    Site Acceptance Test / Implementation OctINITIATIVE 6.1.2 Fiber SONET Installation Germond Delivery Feb

    Install Apr Test and Commission May

    INITIATIVE 6.1.3 Fuse Coordination on Feeders Abrari No. 6 Montrose upgraded Jun No. 8 Montrose upgraded Jun

    No. 7 Scholl upgraded DecNo. 7 Columbus upgraded Dec

    No. 2 Western upgraded JunNo. 9 Tropico upgraded Jun

    INITIATIVE 6.1.4 Glorietta Substation Upgrade Abrari Complete prequalification of bidders Mar Submit RFP to Council Mar

    Community meeting Mar

    CEQA JunConstruction OctOperate upgraded substation May

    INITIATIVE 6.1.5 Grandview Substation Upgrade Abrari Start design Sep

    Complete studies and specifications Jun

    Construction OctOperate upgraded substation May

    INITIATIVE 6.1.6 Disturbance Monitors Installation Abrari Operate upgraded Kellogg Dec

    Operate upgraded Rossmoyne JunINITIATIVE 6.1.7 Outage Management System Abueg Prepare specifications Jul

    Vendor se lection DecDelivery and installation JunImplementation Jul

    GOAL 6.2 Upgrade transmission system to 69 kV Abueg Jun Jun

    INITIATIVE 6 .2 .1 T ransmiss ion Conve rsion t o 69 kV Abueg Creat e th ree-way t ransmi ssi on (R ossmoyne-Montr ose -Gl or ie tta ) May

    Upgrade Montrose-Bel Aire to Montrose-Western Jun

    GOAL 6.3 Convert distribution feeders from 4 kV to 12 kV Abueg 2020

    INITIATIVE 6. 3.1 St ations Upgrade t o 12 kV Abra ri Comple te Gr andview recons tr uction of circu it s Jun

    Comple te Gr andview conver sions - tran sfer of loads O ctUpgrade Grandview Substation to 69kV/12kV Oct

    INITIATIVE 6.3.2 Distribu tion Feeders Upgra de to 1 2 kV Abrari Reconstruct Bel Aire service area OctUpgrade 1-2 feeders per year Feb Dec

    GOAL 6.4 Replace all electromechanical relays with state-of-the-art relays Abueg Dec 2018

    INITIATIVE 6.4.1 Disturbance Monitors Installation Abrari Operate upgraded Kellogg Dec

    Operate upgraded Rossmoyne JunINITIATIVE 6.4.2 New Design and Replace Relays Abrari Glendale - Howard Transmission Line May

    Rossmoyne - Howard Transmission Line MayGlendale - Fremont Transmission L ine May

    Rossmoyne - Scholl Transmission Line MayTropico - Scholl Transmission Line MayTropico - Acacia Transmission Line May

    GOAL 6.5 Implement effective asset management Abueg Dec

    INITIATIVE 6.5.1 Electr ic Asset Management System Abueg Prepare cost-benefit analysis Dec

    Evaluate options (joint system or separate) JunImplement plan DecIntegrate with GIS, AMI and SCADA Dec

    INITIATIVE 6.5.2 City-wide GIS Herman Hire a GWP GIS professional AugAward RFP contr act to pop ulate GIS with GWP System DecImplement full GIS use Dec

    GWP STRATEGY MONITORING WORKSHEET

  • 8/13/2019 GWP Strategy Presentation

    23/28

    KRA 7 WORKFORCE 2009 2010 2011 2012 2013 2014

    GOAL 7.1 Continually improve job satisfaction of our employees Steiger Nov

    INITIATIVE 7.1.1 Staffing Levels Steiger Re-evaluate long-term resource needs Dec

    C reat e ongoing pa rt nership wit h Hu man R esour ces D ecINITIATIVE 7.1.2 Competitive Salaries Cline Review and update job classifications June June

    Complete competitive salary study Jan JanImplement educational program for City Council Jan

    INITIATIVE 7.1.3 Internal Communications Kuennen New blog Jan

    Enhanced website DecINITIATIVE 7.1.4 Continuous Training Cline Perform assessment of current and desirable skills for jobs Jan Jan

    Provide an Executive Education Program JuneProvide group internal training classes July

    Provide external training classes Jan

    Assess eff ectiveness o f training p rograms Dec Dec Dec

    GOAL 7.2 Increase annual workforce availability to 87% Bassin Jul DecINITIATIVE 7.2.1 Present and ready to go Cline Provide quarter ly report on availability of personnel Mar

    Provide quarter ly report on unavailability MayImplement programs to reach goal Jul

    GOAL 7.3 Have

  • 8/13/2019 GWP Strategy Presentation

    24/28

    KRA 9 CITY OF GLENDALE 2009 2010 2011 2012 2013 2014

    GOAL 9.1 Improve communications with customers, City Council, and City Departme Steiger NovINITIATIVE 9.1.1 City Council Communications Steiger Create regularly scheduled workshops Jan

    Initiate periodic meetings with CC members Mar INITIATIVE 9.1.2 Public Communications Steiger Implement website blog Jan

    Implement mass notification system OctImplement GTV6 TV show specific to GWP Jan

    INITIATIVE 9.1.3 City Department Communications Steiger Implement periodic update meetings with City departments JunImplemen t ci tywid e scoreboa rd disp lay f or GW P g oal result s Jan

    GOAL 9.2 Develop optimium transfer level for mutual benefit Steiger Jan DecINITIATIVE 9.2.1 Create Awareness Bassin Prepare educational materia l JanINITIATIVE 9.2.2 New Revenue Sources Steiger Initatives 8.5.1, 8.5.2, 4.4.3, 4.3.1 Jan

    GOAL 9.3 Implement communication vehicles to improve GWPs public image Bassin DecINITIATIVE 9.3.1 Project Outreach Kuennen Evaluate communication vehicles to improve GWP Image Jun

    Imp lement a me thodology for iden ti fy ing issues rela ted to image JunImplement plan to inform customers and improve image Dec

    GOAL 9.4 Implement new collaborative ventures with City departments DecINITIATIVE 9.4.1 Joint Ventures Steiger Identify opportunities of mutual interest Jun

    Develop budget and other implementation requirements JunImplement inter-departmental collaborations Dec

    KRA 10 LEGISLATION & REGULATION 2009 2010 2011 2012 2013 2014

    GOAL 10.1 Continue compliance with state and federal regulatory requirements Lins Feb

    GOAL 10.2 Establish and continue on-going relationships with state and federal legis Lins Jan

    GOAL 10.3 Develop specific GWP legislative strategy and initiatives Lins Jan

    GOAL 10.4 Provide quarterly reports on compliance, strategies, relationships and ma Lins Jan

    GWP STRATEGY MONITORING WORKSHEET

  • 8/13/2019 GWP Strategy Presentation

    25/28

    GWP Strategy Scoreboard

    The GWP Strategy Scoreboard will be implementedalong with the strategic plan.

    This scoreboard will evaluate GWPs progresstowards each goal in the plan.

    This assessment will occur on a quarterly basis.

    The results will be communicated to the City

    Manager, City Council, the Commission, CityDepartments, and GWP employees.

    On the next slide is a draft format of this scoreboard.

  • 8/13/2019 GWP Strategy Presentation

    26/28

    KEY

    Goal is ahead of schedule OR is exceeding expectationsGoal is on schedule or is meeting expectations

    Goal is behind s chedule or is below expectations

    KRA & GOALS Due R Q Q Q Q

    WATER SUPPLY

    1 Produce 3,856 AFY from Verdugo Basin 2014 Kavounas

    2 Serve 2,500 AFY recycled water Dec 2013 Kavounas

    3 Institute a 2.5% PBC-like charge to fund water conservation measures Dec 2010 Kavounas

    POWER SUPPLY1 Reduce electrical usage by 7% 2014 Bassin

    2 Increase GPP efficiency to

  • 8/13/2019 GWP Strategy Presentation

    27/28

    KEY

    Goal is ahead of schedule OR is exceeding expectations

    Goal is on schedule or is meeting expectations

    Goal is behind schedule or is below expectations

    KRA & GOALS Due R Q Q Q Q

    GWP STRATEGY SCOREBOARD

    RATES

    1Assure that water rates are less than 80% of the highest water rates among the

    surrounding municipal utilitiesKavounas

    2 Reduce electrical rates to 25% below SCE 2014 Steiger

    3 Increase annual electrical wholesale revenue to $10M 2014 Lins

    WORKFORCE

    1 C ontinually improve job satisfaction of our employees Nov 2009 Steiger

    2 Increase annual workforce availability to 87% 2014 Bassin

    3 Have