09 AREAS VERDES, CONSTRUCCION DE BANCAS DE CONCRETO

S10 METRADOS Und. Metrado

11 AREAS VERDES

11.01 AREAS VERDES m2 100.00

12 CONCRETO ARMADO

12.01 BANCAS DE CONCRETO u 10.00

COSTO DIRECTO

SON : SEIS MIL CUATROCIENTOS SIETE Y 00/100 NUEVOS SOLES

REHABILITACION, MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MANUEL FIDENCIO HIDALGO FLORES

29.07

350.00

6,407.00

009

2,907.00

2,907.00

3,500.00

3,500.00