ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO UNIDAD RENDIMIENTO GRUPO MINIMO MEDIO MAXIMO CIMBRAS Y ANDAMIOS ANDAMIO DE CABALLETE h=1.10 25 USOS LONG=2.50 m PZA 4.00 5.00 6.00 16 10 USOS LONG=2.50 m PZA 11.00 12.00 13.00 16 CIMBRA DALA DESPLANTE 15x20 CON DUELA M2 13.00 14.00 15.00 16 CIMBRA DALA DE LIGA 15x20 CON DUELA M2 13.00 14.00 15.00 16 CIMBRA CASTILLO 2-C 15x20 CON DUELA M2 13.00 14.00 15.00 16 TARIMA PARA CIMBRA 50x100 CON DUELA PZA 18.00 20.00 21.00 16 TARIMA TRIPLAY 1.22X2.44X0.016 PZA 10.00 11.00 12.00 16 PLATAFORMA 1.50X1.00 PARA ELEV MAT HR 1.00 2.00 3.00 16 CIMBRA DALA DESPLANTE 15x20 CON TRIPLAY ML 13.00 14.00 15.00 9 CIMBRA CASTILLO 2-C 15x15 CON TRIPLAY ML 45.00 50.00 53.00 16 CIMBRA DALA DE LIGA 15x20 CON TRIPLAY M2 13.00 14.00 15.00 16 CIMBRA CASTILLO 2-C 15x20 CON TRIPLAY ML 13.00 14.00 15.00 16 CIMBRA CASTILLO 2-C 15x30 CON TABLA M2 12.00 13.00 14.00 16 FABRICACION DE CONCRETO FABRICADO DE CONCRETO C/REVOLVEDORA 1 SACO M3 13.00 15.00 16.00 5 DEMOLICION DE CIMIENTOS DE MAMPOSTERIA M3 1.50 1.75 2.00 1 DEMOLICION DE CIMIENTOS DE CONCRETO ARMADO M3 0.50 0.60 0.65 1 DEMOLICION DE MUROS DE MAMPOSTERIA M3 2.00 2.25 2.50 1 DEMOLICON DE MURO DE ADOBE Y TEPETATE M3 4.75 5.50 6.00 1 DEMOLICION MURO DE TABIQUE E=28 cm M2 18.00 20.00 21.00 1 DEMOLICION MURO DE TABIQUE E=28 cm C/RECUPER. M2 5.75 6.75 7.25 1 DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm M2 23.00 25.00 26.00 1 DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm C/R M2 7.75 9.00 9.75 1 DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm M2 22.00 25.00 26.00 1 DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm C/R M2 11.00 13.00 15.00 1 DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm M2 33.00 39.00 42.00 1 DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm C/R M2 23.00 27.00 29.00 1 DEMOLICION CELOSIAS E=10 A 15 cm M2 25.00 27.00 28.00 1 DEMOLICION ESTRUCTURA CONCRETO ARMADO M3 0.55 0.65 0.70 1 DEMOLICION PISO CONCRETO SIMPLE E=8 A 10 cm M2 22.00 26.00 28.00 1 DEMOLICIONES (A MANO Y SIN INCLUIR ACARREOS)

Transcript of Rendimiento Mano de Obra

Page 1: Rendimiento Mano de Obra

ANALISIS DE COSTOSPROPUESTA DE

RENDIMIENTOS DE MANO DE OBRA

CONCEPTO UNIDAD RENDIMIENTO GRUPO

MINIMO MEDIO MAXIMO

CIMBRAS Y ANDAMIOS

ANDAMIO DE CABALLETE h=1.1025 USOS LONG=2.50 m PZA 4.00 5.00 6.00 1610 USOS LONG=2.50 m PZA 11.00 12.00 13.00 16CIMBRA DALA DESPLANTE 15x20 CON DUELA M2 13.00 14.00 15.00 16CIMBRA DALA DE LIGA 15x20 CON DUELA M2 13.00 14.00 15.00 16CIMBRA CASTILLO 2-C 15x20 CON DUELA M2 13.00 14.00 15.00 16TARIMA PARA CIMBRA 50x100 CON DUELA PZA 18.00 20.00 21.00 16TARIMA TRIPLAY 1.22X2.44X0.016 PZA 10.00 11.00 12.00 16PLATAFORMA 1.50X1.00 PARA ELEV MAT HR 1.00 2.00 3.00 16CIMBRA DALA DESPLANTE 15x20 CON TRIPLAY ML 13.00 14.00 15.00 9CIMBRA CASTILLO 2-C 15x15 CON TRIPLAY ML 45.00 50.00 53.00 16CIMBRA DALA DE LIGA 15x20 CON TRIPLAY M2 13.00 14.00 15.00 16CIMBRA CASTILLO 2-C 15x20 CON TRIPLAY ML 13.00 14.00 15.00 16CIMBRA CASTILLO 2-C 15x30 CON TABLA M2 12.00 13.00 14.00 16FABRICACION DE CONCRETO

FABRICADO DE CONCRETO C/REVOLVEDORA 1 SACO M3 13.00 15.00 16.00 5

DEMOLICION DE CIMIENTOS DE MAMPOSTERIA M3 1.50 1.75 2.00 1DEMOLICION DE CIMIENTOS DE CONCRETO ARMADO M3 0.50 0.60 0.65 1DEMOLICION DE MUROS DE MAMPOSTERIA M3 2.00 2.25 2.50 1DEMOLICON DE MURO DE ADOBE Y TEPETATE M3 4.75 5.50 6.00 1DEMOLICION MURO DE TABIQUE E=28 cm M2 18.00 20.00 21.00 1DEMOLICION MURO DE TABIQUE E=28 cm C/RECUPER. M2 5.75 6.75 7.25 1DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm M2 23.00 25.00 26.00 1DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm C/R M2 7.75 9.00 9.75 1DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm M2 22.00 25.00 26.00 1DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm C/R M2 11.00 13.00 15.00 1DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm M2 33.00 39.00 42.00 1DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm C/R M2 23.00 27.00 29.00 1DEMOLICION CELOSIAS E=10 A 15 cm M2 25.00 27.00 28.00 1DEMOLICION ESTRUCTURA CONCRETO ARMADO M3 0.55 0.65 0.70 1DEMOLICION PISO CONCRETO SIMPLE E=8 A 10 cm M2 22.00 26.00 28.00 1

DEMOLICIONES (A MANO Y SIN INCLUIR ACARREOS)

Page 2: Rendimiento Mano de Obra

DEMOLICION DE LOSETA DE BARRO C/MORTERO M2 16.00 19.00 21.00 1DEMOLICION DE ZOCLO DE LOSETA C/MORTERO ML 63.00 74.00 80.00 1DESMONTAJE DE PISO DE DUELA C/BASTIDOR Y BASES M2 17.00 20.00 22.00 16DESPEGAR PISO DE LOSETA VINILICA M2 41.00 48.00 52.00 1DEMOLICION DE LAMBRIN DE AZULEJO C/MORTERO M2 17.00 20.00 22.00 1DEMOLICION DE APLANADOS,.YESO O PASTAS M2 21.00 25.00 27.00 1DEMOLICION DE FALSO PLAFOND DE YESO C/BASTIDOR M2 21.00 24.00 26.00 1DESMONTAJE DE CANCELERIA METALICA M2 14.00 16.00 17.00 22LEVANTAR TAPIZ PLASTICO M2 90.00 100.00 105.00 1DESMONTAJE DE PUERTAS DE MADERA C/MARCO PZA 8.00 10.00 11.00 17DESMONTAJE DE CANCELERIA DE MADERA M2 14.00 16.00 17.00 17DESMONTAJE DE VIDRIOS M2 24.00 28.00 30.00 28DESMONTAJE DE MUEBLES SANITARIOS PZA 5.00 6.00 6.50 30DESMONTAJE DE TUBERIA HID. COBRE O GALV. ML 77.00 90.00 97.00 30DESMONTAJE DE LAMPARAS SOBREPONER 60x60 PZA 8.50 10.00 11.00 32DESMONTAJE DE TUBERIA STEEL O PVC C/CONEXIONES ML 18.00 21.00 23.00 32DEMOLICION DE GUARNICION DE CONCRETO SIMPLE ML 18.00 20.00 21.00 1DEMOLICION DE BANQUETA CONCRETO SIMPLE E=10 cm M2 21.00 24.00 26.00 1DEMOLICION CARPETA ASFALTICA E=5 A7 cm M2 17.00 25.00 26.00 1DEMOLICION DE PAVIMENTO CONCRETO SIMPLE M3 0.90 1.05 1.15 1DEMOLICION DE PAVIMENTO CONCRETO ARMADO M3 0.38 0.45 0.49 1DESMONTAJE MUEBLE TIPO MOSTRADOR S/SECCIONADO ML 6.00 7.00 7.50 17DESMONTAJE MUEBLE TIPO MOSTRADOR C/SECCIONADO ML 3.75 4.50 4.75 17TALA DE ARBOL DIAM=10 A 30 cm C/DESENRICE PZA 3.50 4.00 4.50 1TALA DE ARBOL DIAM=31 A 60 cm C/DESENRICE PZA 1.00 1.25 1.35 1TALA DE ARBOL DIAM=61 A 100 cm C/DESENRICE PZA 0.35 0.50 0.65 1TALA DE ARBOL DIAM=101 A 120 cm C/DESENRICE PZA 0.34 0.40 0.43 1DEMOLICION C/POLVO EXPLOSIVO C/BARRENACION M3 9.00 10.00 11.00 9LIMPIEZA Y TRAZO

LIMPIEZA Y DESENRAICE A MANO H=1.00 m M2 49.00 57.00 62.00 1LIMPIEZA A MANO HASTA 8 cm ESPESOR PARA TRAZO M2 90.00 100.00 105.00 1LIMPIEZA Y DESENRAICE A MANO H=0.10 A 0.50 m M2 65.00 75.00 85.00 1LIMPIEZA GRUESA CON PALA SIN BARRER, POSRETIRO ESCOMBRO M2 70.00 80.00 87.00 1TRAZO Y NIVELACION SUP. MENOR A 300 M2 M2 200.00 240.00 260.00 10TRAZO Y NIVELACION SUP. DE A 300 A 900 M2 M2 250.00 300.00 325.00 10TRAZO Y NIVELACION SUP. MAYOR A 900 M2 M2 340.00 400.00 430.00 10EXCAVACIONES

EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO I CON AFINE M3 4.00 4.75 5.25 1EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO II CON AFINE M3 2.25 2.75 3.00 1EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO II-A CON AFINE M3 1.00 1.25 1.35 1EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO I CON AFINE M3 2.25 2.50 2.75 1

Y TARIMA PARA EXCAVACION 18.50 16EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO II CON AFINE M3 1.50 1.75 2.00 1

Page 3: Rendimiento Mano de Obra

Y TARIMA PARA EXCAVACION 18.50 16EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO II-A CON AFINE M3 0.85 1.00 1.10 1

Y TARIMA PARA EXCAVACION 18.50 16EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO I CON AFINE M3 4.00 4.50 4.75 1EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO II CON AFINE M3 3.00 3.60 3.90 1EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO II-A CON AFINE M3 1.25 1.50 1.65 1EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO III (ROCA) M3 0.90 1.10 1.20 1RELLENOS

RELLENO COMPACTADO CON PISON EN CAPAS DE 20 cm M3 5.00 5.75 6.25 1RELLENO DE CEPAS COMPACTADO AL 90% CON BAILARINA M3 6.50 7.50 8.15 1DREN 30x30 CON GRAVA, INC.: EXC., RELL, TUBO JUNTEADO C/MORTERO ML 10.00 12.00 13.00 9CAMA FILTRANTE DE GRAVA 3/4" DE 20 cm DE ESPESOR M2 16.00 20.00 24.00 1PLANTILLAS

CONSOLIDACION DE FONDO DE CEPAS CON PISON M2 43.00 50.00 54.00 1PLANTILLA DE PEDACERIA DE TABIQUE H=10 cm M2 10.00 12.00 13.00 1PLANTILLA DE PEDACERIA DE TABIQUE H=15 cm M2 8.50 10.00 11.00 1PLANTILLA DE CONCRETO H=5, NO INCLUYE FABRICADO DE CONCRETO M2 27.00 32.00 35.00 9PLANTILLA DE CONCRETO H=8, NO INCLUYE FABRICADO DE CONCRETO M2 24.00 28.00 30.00 9PLANTILLA DE CONCRETO H=10, NO INCLUYE FABRICADO DE CONCRETO M2 17.00 20.00 22.00 9PLANTILLA DE ARENA H=5 cm M2 30.00 35.00 37.00 1CIMIENTOS DE MAMPOSTERIA

CIMIENTO DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADO C/MORTERO M3 2.25 2.75 3.00 9CIMBRA EN CIMENTACION

CIMBRA ZAPATA CORRIDA Y AISLADA H=10 A 15 cm M2 10.75 12.50 13.50 16 INCL. DESCIMBRADO 50.00 16

CIMBRA CONTRATRABES DE 20x80 A 25x100 cm M2 9.75 11.50 12.50 16 INCL. DESCIMBRADO 30.00 16

CIMBRA EN ESTRUCTURA

CIMBRA EN COLUMNAS CON DUELA DE 30x30 cm A 50x50 cm, H=3.00 m M2 8.00 9.50 10.25 16 INCL. DESCIMBRADO 26.28 16

CIMBRA EN COLUMNAS CON TRIPLAY DE 30x30 cm A 50x50 cm, H=3.00 m M2 7.75 9.00 9.75 16 INCL. DESCIMBRADO 23.00 16

CIMBRA EN COLUMNA CIRCULAR CON DUELA DIAM 40 cm, H=3.00 m M2 6.00 7.00 7.50 16 INCL. DESCIMBRADO 18.76 16

CIMBRA EN COLUMNA CIRCULAR CON SONOTUBO DIAM 40 cm, H=3.00 m M2 10.25 12.00 13.00 16 INCL. DESCIMBRADO 19.53 16

CIMBRA EN TRABES CON DUELA DE 25x40 A 40x60 cm M2 9.00 10.50 11.50 16 INCL. DESCIMBRADO 28.13 16

CIMBRA EN TRABES CON TRIPLAY DE 25x40 A 40x60 cm M2 8.50 10.00 10.75 16 INCL. DESCIMBRADO 24.61 16

CIMBRA EN LOSAS CON DUELA DE 10 A 15 cm DE PERALTE M2 8.75 10.25 11.00 16 INCL. DESCIMBRADO 41.00 16

CIMBRA EN LOSAS CON TRIPLAY DE 10 A 15 cm DE PERALTE M2 9.00 10.50 11.25 16

Page 4: Rendimiento Mano de Obra

INCL. DESCIMBRADO 42.00 16CIMBRA EN LOSAS CON TARIMA DE 10 A 20 cm DE PERALTE M2 10.75 12.50 13.50 16

INCL. DESCIMBRADO 50.00 16CIMBRA EN MUROS DE 20 cm DE ESPESOR M2 8.50 10.00 10.75 16

INCL. DESCIMBRADO 27.22 16CIMBRA EN RAMPAS DE ESCALERA DE 15 cm DE PERALTE M2 7.25 8.50 9.25 16

INCL. DESCIMBRADO 34.00 16

ACERO DE REFUERZO EN CIMENTACION #2 TON 0.13 0.14 0.16 18ACERO DE REFUERZO EN CIMENTACION #2.5 TON 0.15 0.17 0.18 18ACERO DE REFUERZO EN CIMENTACION #3 TON 0.21 0.23 0.24 18ACERO DE REFUERZO EN CIMENTACION #4 TON 0.27 0.30 0.32 18ACERO DE REFUERZO EN CIMENTACION #5 TON 0.25 0.30 0.35 18ACERO DE REFUERZO EN CIMENTACION #6, #8, #10 Y #12 TON 0.30 0.35 0.40 18

ACERO DE REFUERZO EN ESTRUCTURA #2 TON 0.12 0.13 0.14 18ACERO DE REFUERZO EN ESTRUCTURA #2.5 TON 0.15 0.16 0.17 18ACERO DE REFUERZO EN ESTRUCTURA #3 TON 0.18 0.20 0.21 18ACERO DE REFUERZO EN ESTRUCTURA #4 TON 0.23 0.27 0.30 18ACERO DE REFUERZO EN ESTRUCTURA #5 TON 0.25 0.30 0.35 18ACERO DE REFUERZO EN ESTRUCTURA #6, #8, #10 Y #12 TON 0.25 0.30 0.35 18MALLA ELECTROSOLDADA EN PISOS 6x6-4/4 Y 6x6-6/6 M2 67.00 82.00 92.00 18MALLA ELECTROSOLDADA EN PISOS 6x6-8/8 M2 68.00 84.00 94.00 18MALLA ELECTROSOLDADA EN PISOS 6x6-10/10 M2 80.00 98.00 110.00 18MALLA ELECTROSOLDADA EN MUROS 6x6-4/4 M2 56.00 69.00 77.00 18MALLA ELECTROSOLDADA EN MUROS 6x6-6/6 Y 6x6-8/8 M2 58.00 71.00 80.00 18MALLA ELECTROSOLDADA EN MUROS 6x6-10/10 M2 67.00 82.00 92.00 18

CONCRETO EN CIMENTACION VACIADO CON CARRETILLA Y BOTES M3 8.00 9.50 10.25 133.03 1

CONCRETO EN CIMENTACION VACIADO CON BOMBA M3 21.00 24.00 26.00 133.03 1

CONCRETO CICLOPEO EN CIMENTACION M3 13.00 15.00 16.00 13

CONCRETO EN COLUMNAS Y MUROS VACIADO CON CARRETILLA Y BOTES M3 5.00 6.00 6.50 131.60 1

CONCRETO EN TRABES Y LOSAS VACIADO CON CARRETILLA Y BOTES M3 6.75 8.00 8.75 132.14 1

CONCRETO EN TRABES RETICULARES VACIADO CON CARRETILLA Y BOTES M3 6.00 7.00 7.50 132.50 1

CONCRETO EN COLUMNAS Y MUROS VACIADO CON BOMBA M3 13.00 15.00 16.00 131.60 1

CONCRETO EN TRABES Y LOSAS VACIADO CON BOMBA M3 19.00 22.00 24.00 13

ACERO DE REFUERZO EN CIMENTACION (HABILITADO Y ARMADO) (SIN GANCHOS, TRASLAPES NI ANCLAJES)

ACERO DE REFUERZO EN ESTRUCTURA (HABILITADO Y ARMADO) (SIN GANCHOS, TRASLAPES NI ANCLAJES)

CONCRETO EN CIMENTACION (COLOCACION, VIBRADO, CURADO) (NO INCLUYE FABRICACION)

CONCRETO EN ESTRUCTURA (COLOCACION, VIBRADO, CURADO) (NO INCLUYE FABRICACION)

Page 5: Rendimiento Mano de Obra

2.14 1CONCRETO EN TRABES RETICULARES VACIADO CON BOMBA M3 17.00 20.00 22.00 13

2.50 1DALAS DE DESPLANTE

15x15, 4 #3, E #2 @ 30 ML 8.75 10.25 11.00 971.42 1

15x20, 4 #3, E #2 @ 30 ML 8.25 9.75 10.50 953.70 1

15x25, 4 #3, E #2 @ 30 ML 8.00 9.25 10.00 943.02 1

15x30, 4 #3, E #2 @ 30 ML 7.00 8.25 9.00 935.71 1

DALAS DE LIGA, TRABES Y CASTILLOS

15x15, 4 #3, E #2 @ 25 ML 8.50 10.00 10.75 971.42 1

15x20, 4 #3, E #2 @ 15 A 25 ML 8.00 9.50 10.25 953.70 1

15x25, 4 #3, E #2 @ 25 ML 7.75 9.00 9.75 943.02 1

15x30 Y 20x25, 4 #3, E #2 @ 25 ML 6.75 8.00 8.75 935.71 1

20x30, 4 #3, E #2 @ 25 ML 6.00 7.00 7.50 926.75 1

CASTILLO AHOGADO 1 HUECO DE BLOCK DE 15 cm CON 1 #3 ML 22.00 25.50 27.50 9CASTILLO AHOGADO 2 HUECOS DE BLOCK DE 15 cm CON 2 #3 ML 14.50 17.00 18.50 9MUROS

MURO DE MAMPOSTERIA DE 30 A 40 cm DE ESPESOR M3 1.75 2.00 2.25 9SOBREPRECIO POR CARA ACABADO APARENTE MURO MAMPOSTERIA M2 6.00 7.00 7.50 9MURO DE TABIQUE E=7 M2 10.25 12.00 13.00 9SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=7 M2 55.00 64.00 69.00 9MURO DE TABIQUE E=14 M2 9.00 10.50 11.50 9SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=14 M2 46.00 55.00 59.00 9MURO DE TABIQUE E=21 M2 6.50 7.75 8.25 9SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=21 M2 37.00 43.00 46.00 9MURO DE TABIQUE E=28 M2 5.40 6.00 6.30 9SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=28 M2 43.00 50.00 54.00 9MURO DE BLOCK 15x20x40, E=15 M2 9.00 10.25 11.00 9MURO DE BLOCK 20x20x40, E=20 M2 8.50 9.75 10.50 9SOBREPRECIO POR CARA ACABADO APARENTE MURO DE BLOCK M2 69.00 80.00 86.00 9

FIRME DE CONCRETO E=5 cm M2 26.00 30.50 33.00 9SIN ACABADO 26.45 1

FIRME DE CONCRETO E=8 cm M2 20.50 24.00 26.00 9

FIRMES Y PISOS (NO INCLUYE FABRICADO DE CONCRETO)

Page 6: Rendimiento Mano de Obra

SIN ACABADO 26.45 1FIRME DE CONCRETO E=10 cm M2 19.50 23.00 25.00 9

SIN ACABADO 26.45 1ACABADO ESCOBILLADO INTEGRAL SOBRE CONCRETO FRESCO M2 40.50 47.50 51.00 9

ACABADO PULIDO INTEGRAL SOBRE CONCRETO FRESCO M2 25.50 30.00 32.50 9FIRME DE CONCRETO E=8 cm CON MALLA ELECTROSOLDADA M2 15.00 17.50 19.00 9

SIN ACABADO 26.45 1FIRME DE CONCRETO E=10 cm CON MALLA ELECTROSOLDADA M2 14.50 17.00 18.50 9

SIN ACABADO 26.45 1FIRME DE CONCRETO E=8 cm CON FIBRA PLASTICA M2 20.50 24.00 26.00 9

SIN ACABADO 26.45 1FIRME DE CONCRETO E=10 cm CON FIBRA PLASTICA M2 19.50 23.00 25.00 9

SIN ACABADO 26.45 1SOBREPISO DE MORTERO E=3 cm M2 26.00 30.50 33.00 9

SIN ACABADO 71.42 1PISO DE AZULEJO 11x11 cm M2 6.25 7.25 7.75 15PISO DE LOSETA 10x20 cm M2 5.00 5.75 6.25 15PISO DE LOSETA 15x15 cm M2 5.50 6.50 7.00 15PISO DE LOSETA 15x30 cm M2 8.00 9.25 10.00 15PISO DE LOSETA 20x20 cm M2 7.25 8.50 9.25 15PISO DE LOSETA 20x30 cm M2 8.50 10.00 11.00 15PISO DE LOSETA 30x30 cm M2 10.25 12.00 13.00 15PISO DE LOSETA 30x40 cm M2 10.25 12.00 13.00 15ZOCLO DE AZULEJO 11x11 cm, H=11 cm ML 16.00 18.00 19.00 8ZOCLO DE LOSETA 10x20 cm, H=10 cm ML 20.50 24.00 26.00 15ZOCLO DE LOSETA 15x15 cm, H=15 cm ML 20.50 24.00 26.00 15PISO DE DUELA MACHIMBRADA DE 1/2" BARNIZADA M2 10.00 12.00 13.00 17PISO DE PARQUET DE MADERA DE 6 mm M2 10.00 12.00 13.00 17PISO DE LOSETA VINILICA M2 30.50 35.50 38.50 15ZOCLO VINILICO ML 67.00 75.00 79.00 15SARDINEL DE AZULEJO 11X11 cm ML 4.20 5.00 5.40 8PLAFONES Y MUROS DIVISORIOS

MURO DE TABLAROCA 1/2" C/POSTE @ 61 cm M2 14.00 15.00 20.00 63MURO DE TABLAROCA 1/2" C/POSTE @ 41 cm M2 12.50 13.50 16.30 63MURO DE TABLAROCA 1/2" C/POSTE @ 30.5 cm M2 11.00 12.00 12.60 63APLANADOS EN MUROS Y PLAFONES

REPELLADO EN MUROS CON MORTERO CEMENTO-ARENA, e=2 cm M2 18.50 21.50 23.00 979.37 1

REPELLADO EN PLAFONES CON MORTERO CEMENTO-ARENA, e=2 cm M2 13.50 16.00 17.50 971.43 1

APLANADO EN MUROS PULIDO A PLANA CON MORTERO C-A, e=2.5 cm M2 12.00 14.00 15.00 979.37 1

APLANADO EN PLAFONES PULIDO A PLANA CON MORTERO C-A, e=2.5 cm M2 8.75 10.25 11.00 9

Page 7: Rendimiento Mano de Obra

71.43 1APLANADO EN MUROS PULIDO A LLANA CON MORTERO C-A, e=2.5 cm M2 10.50 12.50 13.50 9

79.37 1APLANADO EN PLAFONES PULIDO A LLANA CON MORTERO C-A, e=2.5 cm M2 7.75 9.00 9.75 9

71.43 1PERFILADO DE ARISTAS EN REPELLADO DE 6 cm CON MORTERO C-A ML 22.50 26.50 28.50 9

714.29 1PERFILADO DE ARISTAS EN APLANADO PULIDO A PLANA DE 6 cm ML 18.00 21.00 22.50 9CON MORTERO C-A 714.29 1PERFILADO DE ARISTAS EN APLANADO PULIDO A LLANA DE 6 cm ML 16.00 18.50 20.00 9CON MORTERO C-A 714.29 1RASTREADO DE YESO PARA RECIBIR TIROL EN MUROS Y PLAFONES M2 31.02 33.00 34.65 20RECUBRIMIENTOS EN MUROS

RECUBRIMIENTO DE PASTA ACABADO RAYADO O PICADO M2 10.25 12.00 13.00 979.37 1

PERFILADO DE ARISTA CON PASTA ACABADO RAYADO O PICADO DE 6 cm ML 15.50 18.00 19.50 9714.29 1

RECUBRIMIENTO TEXTURIZADO CON PASTA COREV M2 8.50 10.50 11.50 15RECUBRIMIENTO DE AZULEJO 11x11 cm M2 5.25 6.00 6.50 15RECUBRIMIENTO CON LOSETA 10x20 cm M2 5.50 6.00 6.30 15RECUBRIMIENTO CON LOSETA 15x15 cm M2 5.50 6.00 6.30 15RECUBRIMIENTO CON LOSETA 15x20 cm M2 5.50 6.00 6.30 15RECUBRIMIENTO CON LOSETA 20x20 cm M2RECUBRIMIENTO CON LOSETA 15x15 cm M2RECUBRIMIENTO DE ARISTA CON AZULEJO 11x11 cm DE 8 cm M2 12.00 14.00 15.00 15RECUBRIMIENTO DE ARISTA CON LOSETA 10x20 cm DE 8 cm M2RECUBRIMIENTO DE ARISTA CON LOSETA 15x15 cm DE 8 cm M2 13.50 16.00 17.50 15COLOCACIONES Y AMACIZADOS

COL. DE HERRERIA AMACIZADA CON MORTERO CEMENTO-ARENA M2 7.75 8.75 9.25 9COL. DE JUEGO DE 6 PIEZAS DE ACCESORIOS DE BAÑO DE EMPOTRAR LOTE 2.00 2.50 2.75 15COL. DE LAVADERO DE CONCRETO AMACIZADO CON MORTERO C-A PZA 2.50 2.75 3.00 9IMPERMEABILIZACIONES

IMPERMEABILIZACION DE DALAS DE DESPLANTE O CHAROLAS DE BAÑOCON 1 DE IMPERPRIN SL, 2 DE FIBRACOAT Y RIEGO DE ARENA M2 48.50 56.00 61.00 64

CON 1 DE HIDRO PRIMER, 2 DE VAPORTITE 550, 1 FESTER FELT Y ARENA M2 36.50 42.50 46.00 64CON 1 DE PRIMER, 2 EMULSION ASFALTICA, 1 FIELTRO #15 Y ARENA M2 45.00 53.00 57.00 64

97.47 1IMPERMEABILIZACION DE AZOTEA CON

1 IMPERPRIN SSL, 3 FIBRACOAT S-40, 1 VITROCOAT Y RIEGO DE ARENA M2 43.50 51.00 55.00 641 HIDRO PRIMER, 2 ROOF COATING, 1 FESTER FLEX Y ARENA M2 54.50 63.50 68.50 64

1 PRIMER, 3 EMULSION ASFALTICA, 2 FIELTRO Y PINTURA REFLEJANTE M2 40.00 45.00 49.00 64222.22 1

PRIMER, EMULSION ASFALTICA, ASFALTO OXIDADO Y CARTON ARENADO M2 51.60 54.90 57.64 9

Page 8: Rendimiento Mano de Obra

3333.33 9IMPERMEABILIZACION SOBRE DESPLANTE DE MUROS CON

1 ASFALTO OXIDADO Y FIELTRO ASFALTICO ML 164.00 180.00 189.00 91333.33 9

AZOTEAS

ENTORTADO DE 3 cnm DE ESPESOR CON MORTERO CEMENTO-ARENA M2 23.00 27.00 29.00 9CHAFLAN 10x10 cm CON CONCRETO ML 30.00 33.00 35.00 9ALBAÑALES, DRENES Y REGISTROS

REGISTRO 40x60 Y PROF. DE 0.80 m PZA 1.50 1.75 2.00 9REGISTRO 40x60 Y PROF. DE 1.00 A 1.20 m PZA 1.25 1.50 1.75 9REGISTRO 40x60 Y PROF. DE 1.40 m PZA 1.00 1.25 1.50 9YESERIA

APLANADO EN MUROS CON YESO-AGUA A TALOCHA M2 25.50 30.00 32.50 20APLANADO EN MUROS CON YESO-AGUA C/MAESTRAS A REVENTON M2 21.00 24.50 26.50 20APLANADO EN MUROS CON YESO-AGUA C/MAESTRAS A PLOMO Y REGLA M2 16.00 19.00 20.50 20APLANADO EN PLAFOND CON YESO-AGUA A TALOCHA M2 24.50 28.50 31.00 20APLANADO EN PLAFOND CON YESO-AGUA C/MAESTRAS A REVENTON M2 19.00 22.00 24.00 20APLANADO EN PLAFOND CON YESO-AGUA C/MAESTRAS A PLOMO Y REGLA M2 16.00 18.50 20.00 20PERFILADO DE ARISTAS CON YESO DE 6 cm DE ANCHO ML 19.00 22.00 24.00 20YESO EN COLUMNAS RECTANGULARES C/MAESTRAS A PLOMO Y REGLA M2 5.25 6.00 6.50 20YESO EN TRABES C/MAESTRAS A PLOMO, NIVEL Y REGLA M2 6.00 7.00 7.50 20TIROL EN MUROS ACABADO RUSTICO M2 20.50 24.00 26.00 20TIROL EN MUROS ACABADO PLANCHADO M2 16.50 19.50 21.00 20TIROL EN PLAFONES ACABADO RUSTICO M2 19.00 22.50 24.50 20TIROL EN PLAFONES ACABADO PLANCHADO M2 15.50 18.00 19.50 20FALSO PLAFOND DE YESO CON METAL DESPLEGADO M2 5.75 6.75 7.25 20HERRERIA

REJILLA PLUVIAL DE ANGULO Y SOLERA, FABRICACION Y COLOCACION KG 18.80 20.00 21.00 22101.01 9

2000.00 1REGISTRO CON TAPA METALICA DE 80x80 cm CON LAMINA NEGRA PZA 3.50 4.00 4.50 22

CAL. 18, CON PORTACANDADO, BISAGRAS, MARCO DE ANGULO, 12.23 9PINTURA ANTICORROSIVA. 42.80 1

CARPINTERIA

PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.70x2.10 m PZA 1.60 1.80 1.90 17PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.80x2.10 m PZA 1.60 1.70 1.80 17PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.90x2.10 m PZA 1.45 1.60 1.70 17PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.70x2.10 m PZA 0.95 1.00 1.05 17PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.80x2.10 m PZA 0.90 0.95 1.00 17PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.90x2.10 m PZA 0.85 0.90 0.95 17CHAMBRANA P/PUERTA CON BATIENTE SOBREPUESTO PZA 7.30 8.00 8.40 17CERRADURA COLOCADA EN PUERTA DE MADERA PZA 6.00 7.00 7.50 17BISAGRA DE DOBLE ACCION COLOCADA EN PUERTA DE MADERA PZA 6.00 7.00 7.50 17

Page 9: Rendimiento Mano de Obra

LAMBRIN DE DUELA DE ½" SOBRE BASTIDOR @ 45 cm A.S. M2 4.25 5.00 5.50 17LAMBRIN DE DUELA DE ½" SOBRE BASTIDOR @ 60 cm A.S. C/BARNIZ M2 3.85 4.20 4.45 17

5.50 21FALSO PLAFON DE DUELA CACBADO CON BARNIZ M2 3.45 3.75 3.95 17

3.50 21PINTURA

PINTURA VINILICA EN MUROS Y PLAFONES DE YESO, 1S + 2M + PREP. SUP. M2 23.00 25.00 26.00 21PINTURA VINILICA EN MUROS Y PLAFONES DE MEZCLA, 1S + 2M + PREP. SUP. M2 18.00 20.00 21.00 21PINTURA VINILICA EN MUROS Y PLAFONES CONCRETO, 1S + 2M + PREP. SUP. M2 23.00 25.00 26.00 21PINTURA ESMALTE, MUROS Y PLAFONES DE YESO, 1S + 2M + PREP. SUP. M2 20.00 22.00 23.00 21PINTURA ESMALTE, MUROS Y PLAFONES CONCRETO, 1S + 2M + PREP. SUP. M2 20.00 22.00 23.00 21PINTURA ESMALTE SOBRE SUP. METALICAS, 1P +2M +PREP. SUP. M2 23.00 25.00 26.00 21PINTURA ESMALTE EN VENTANERIA METALICA, 1P + 2M + PREP.SUP. M2 17.00 20.00 21.50 21BARNIZ NATURAL C/BROCHA S/MADERA, 1S + 2M + PREP.SUP. M2 13.25 15.00 16.00 21BARNIZ MARINO C/MUÑECA S/MADERA, 1S + 2M + PREP.SUP. M2 6.30 7.00 7.35 21PINTURA ESMALTE EN CHAMBRANAS, TUBERIAS, PERF. METALICOS, ETC ML 52.00 60.00 64.00 21PINTURA ESMALTE EN VENTANAS, BARANDALES, REJAS Y ESCALERAS M2 17.00 20.00 21.00 21PINTURA ESMALTE EN PUERTAS Y SUP. DE MADERA, 2M + PREP.SUP. M2 17.00 20.00 21.00 21PINTURA ESMALTE EN PLAFONES DE MEZCLA, 1S + 2M + PREP. SUP. M2 17.00 20.00 21.00 21JARDINERIA

SIEMBRA DE PASTO EN ROLLO M2 83.00 90.00 95.00 9COLOCACION DE TIERRA VEGETAL PARA JARDINERIA M3 10.00 11.00 11.60 1COLOCACION DE TIERRA LAMA PARA JARDINERIA M3 10.00 11.00 12.00 1LIMPIEZA

LIMPIEZA DE AZULEJO EN MUROS C/ACIDO, JABON EN POLVO Y AGUA M2 39.00 45.50 49.00 1LIMPIEZA DE AZULEJO EN PISOS C/ACIDO, JABON EN POLVO Y AGUA M2 45.50 53.00 57.00 1LIMPIEZA DE LOSETA VINILICA EN PISOS CON AGUA Y JABON M2 74.00 87.00 94.00 1LIMPIEZA DE MUEBLES SANITARIOS CON ACIDO, AGUA Y JABON. PZA 7.00 8.00 9.00 1LIMPIEZA DE VIDRIOS AMBAS CARAS CON AGUA Y JABON M2 25.50 30.00 32.50 1LIMPIEZA DE ESPEJOS CON AGUA Y JABON M2 51.00 60.00 65.00 1LIMPIEZA GRUESA GENERAL DE OBRA C/ACOPIO Y ACARREO HOR. A 20m M2 45.00 50.00 53.00 1INSTALACION DE MUEBLES SANITARIOS Y ACCESORIOS

LAVABO COMPLETO CON ACCESORIOS (REINSTALACION) PZA 3.25 3.75 4.00 30LAVABO COMPLETO CON ACCESORIOS PZA 1.00 1.35 1.50 5-INSTW.C. TANQUE BAJO COMPLETO CON ACCESORIOS (REINSTALACION) PZA 3.25 3.75 4.00 30W.C. TANQUE BAJO COMPLETO CON ACCESORIOS PZA 2.25 2.75 3.00 5-INSTW.C. C/FLUXOMETRO COMPLETO CON ACCESORIOS PZA 3.25 3.75 4.00 30MINGITORIO C/FLUX. COMPLETO CON ACCESORIOS PZA 3.25 3.75 4.00 30FREGADERO ACERO INOX. 2 ESCURR. COMPLETO CON ACCESORIOS PZA 3.25 3.75 4.00 30CALENTADOR O REGADERA (REINSTALACION) PZA 3.25 3.75 4.00 30CALENTADOR PZA 1.30 1.50 1.80 5-INSTLLAVE DE NARIZ PARA LAVADERO JGO 5.00 5.75 6.25 30INSTALACION ELECTRICA

Page 10: Rendimiento Mano de Obra

ALAMBRE TW CAL. 12 ML 400.00 5-INSALAMBRE TW CAL. 10 ML 340.00 5-INSALAMBRE TW CAL. 8 ML 290.00 5-INSCENTRO DE CARGA PZA 4.50 6.00 7.00 3-INS

8.00 1-INSTTUBO STEEL P/GRUESA 13 ML 60.00 5-INSTUBO STEEL P/GRUESA 19 ML 60.00 5-INSTUBO STEEL P/GRUESA 25 ML 42.00 5-INSTUBO STEEL P/GRUESA 38 ML 32.00 5-INSTUBO STEEL P/GRUESA 50 ML 24.00 5-INSTUBO STEEL P/DELGADA 13 ML 90.00 5-INSTUBO PVC 25 ML 63.00 5-INSSALIDA DE ALUMBRADO O CONTACTOS SAL 0.15 0.20 0.22 32SALIDA DE TELEFONO O TELEVISION SAL 2.25 2.50 2.75 32

Page 11: Rendimiento Mano de Obra

Investigación de rendimientos de mano de obraConcepto Unidad Grupo de Rendimiento Fuente de

trabajo ConsultaPreliminares y cimentacion

Plantillas entre 0.07 y 0.01 m. m² 2 14m²/jor Suarez SalazarCastillo centro de Block 1ø (3/8") 9.5 mm. m 5 30m/jor Suarez SalazarCastillos y Cadenas 15×15 con 4ø(3/8")9.5 m 5 10m/jor Suarez SalazarCastillos y Cadenas 15×20 con 4ø(3/8")9.5 m 5 9.5m/jor Suarez SalazarCastillos y Cadenas 15×30 con 4ø(3/8")9.5 m 5 8m/jor Suarez Salazar

Concepto Unidad Grupo de Rendimiento Fuente detrabajo Consulta

Preliminares y cimentacionLimpia y trazo m² 2 50 m²/jor Suarez SalazarExcavacion en tierra hasta m³ 1 4 m³/jor Suarez Salazar2 m de profundidadExcavacion en tepetate blando m³ 1 2 m³/jor Suarez Salazarhasta 2 m de profundidadTraspaleado hasta 2m m³ 1 18 m³/jor Suarez SalazarAcarredo con carrtilla a 20.00m. Máximo m³ 1 5 m³/jor Suarez SalazarRellenos por capas compactadas con m³ 1 7 m³/jor Suarez Salazarpiston a manoCompactación de Cepas con m² 1 35m²/jor Suarez Salazar Piston de manoPlantillas entre 0.07 y 0.01 m. m² 2 14m²/jor Suarez SalazarCimientos de Piedra Braza m³ 5 3m³/jor Suarez Salazar

Habilitado y Armado De Fierro de Refuerzo.En Cimentación TON 0.17TON/jor Suarez Salazaren Estructura TON 4 0.16TON/jor Suarez SalazarHabilitado y Armado de Alambrón Suarez Salazarde 1/4 y 5/16" ø TON 4 0.13TON/jor

Cimbrar y Descimbrar, Acabado No AparenteEn Cimientos m² 3 9.5m²/jor Suarez SalazarEn Columnas Rectangulares m² 3 7.5m²/jor Suarez SalazarEn Columnas Circulares m² 3 6m²/jor Suarez SalazarEn Trabes m² 3 8.5m²/jor Suarez SalazarEn Losas m² 3 9 m²/jor Suarez Salazar

Hechura de CimbraEn Cimientos m² 3 17m²/jor Suarez SalazarEn Columnas Rectangulares m² 3 8.5m²/jor Suarez SalazarEn Columnas Circulares m² 3 4m²/jor Suarez SalazarEn Trabes m² 3 10m²/jor Suarez SalazarEn Losas m² 3 10m²/jor Suarez SalazarCimbrar y Descimbrar con Sonotubo m 3 15m/jor Suarez Salazar

Losas ReticularesColocación de Block Hasta 20x40x40cm caja 2 100c/jor Suarez SalazarColocación De BlockHAsta 35x60x60cm caja 2 40c/jor Suarez SalazarEntrepiso Reticular celulado línea menor caja 2 40c/jor Suarez SalazarEntrepiso Reticular celulado línea mayor caja 2 40c/jor Suarez Salazar

Page 12: Rendimiento Mano de Obra

Colados (No Incluyendo la Fabricación de Concreto)En Cimientos m³ 2 1.50m³/jor Suarez SalazarEn Columnas y Muros m³ 2 0.85m³/jor Suarez SalazarEn Trabes y Losas m³ 2 0.95m³/jor Suarez SalazarEn Losas Reticulares m³ 2 0.80m³/jor Suarez SalazarCurado de Concreto con Agua en m³ 1 10m³/jor Suarez SalazarSuperficies HorizontalesCuarado de Concreto Con Agua m² 1 300m²/jor Suarez SalazarEn Superficies Verticales

Muros De Tabique Común o Ligero No Aparente.De 0.17m de espesor m² 5 11m²/jor Suarez SalazarDe 0.14m de espesor m² 5 10m²/jor Suarez SalazarDE 0.21m de espesor m² 5 8m²/jor Suarez SalazarDe 0.28m de espesor m² 5 6m²/jor Suarez SalazarSobre Presio para Cara Aparente m² 5 40m²/jor Suarez SalazarConcepto Unidad Grupo de Rendimiento Fuente de

trabajo ConsultaMuros de Block Tipo Piramide

De 0.10m de espesor m² 5 10m²/jor Suarez SalazarDe 0.12m de espesor m² 5 9.5m²/jor Suarez SalazarDe 0.15m de espesor m² 5 9m²/jor Suarez SalazarDe 0.20m de espesor m² 5 8.5m²/jor Suarez SalazarSobre Presio para Cara Aparente m² 5 80m²/jor Suarez Salazar

Muro de Block ExtruidoDe 5x10x15 en 10cm de espesor m² 6 4.5m²/jor Suarez SalazarDe 6x10x20 en 10 cm de espesor m² 6 5.0m²/jor Suarez SalazarDe 10x10x20 en 10 cm de espesor m² 6 5.5m²/jor Suarez SalazarDe 10x15x20 en 15 cm de espesor m² 6 5.5m²/jor Suarez SalazarSobreprecio para Cara Aparente m² 6 55m²/jor Suarez Salazar

Castillos Y CadenasCastillo centro de Block 1ø (3/8") 9.5 mm. m 5 30m/jor Suarez SalazarCastillos y Cadenas 15×15 con 4ø(3/8")9.5 m 5 10m/jor Suarez SalazarCastillos y Cadenas 15×20 con 4ø(3/8")9.5 m 5 9.5m/jor Suarez SalazarCastillos y Cadenas 15×30 con 4ø(3/8")9.5 m 5 8m/jor Suarez SalazarSobreprecio cara aparente castilos-cadenas m 5 25m/jor Suarez Salazar

RecubrimientosRepellados de Mezcla m² 5 19m²/jor Suarez SalazarAplanados de Mezcla (Rostreados) m² 5 14m²/jor Suarez SalazarAplanados Fionos de Mezcla m² 5 11m²/jor Suarez SalazarAplanados finos de cemento a llana m² 5 10m²/jor Suarez SalazarRecubrimiento de Ceramica o Mosaico m² 6 4m²/jor Suarez SalazarVeneciano, incle repelladoRecubrniento Cintilla 5.5 × 22 × 1.0 a m² 6 4.5m²/jor Suarez Salazar6.0 × 1.0 cm.Recubrimiento fachaleta 10 × 20 ×1 a m² 6 5m²/jor Suarez Salazar11 × 22 ×1 cm.Recubrimiento Azulejo m² 6 5.5m²/jor Suarez SalazarRecubrimiento Tipo Vitricota 6×20×18cm m² 6 4.5m²/jor Suarez SalazarRecubrimiento Tipo Vitricota 10×20×1.8cm m² 6 5m²/jor Suarez SalazarRecubriento Mosaico 20×20×2.0 cm m² 5 9m²/jor Suarez Salazar

Page 13: Rendimiento Mano de Obra

Boquilla Incluyendo cortes a 450 6 16m/jor Suarez SalazarMaterial Verificados

PisosFirmes de Concreto para Pisos, m² 2 10m²/jor Suarez Salazarespesor de 8 a 10 cm.Acabado escobillado integral sobre firmes m² 5 35m²/jor Suarez SalazarFino no Integral acabado pulido m² 5 18m²/jor Suarez SalazarArmado con Malla en Pisos m² 4 50m²/jor Suarez SalazarPisos creamica sin firme m² 6 5m²/jor Suarez SalazarPisos loseta 15×15×1.0 cm a 2 cm m² 6 7m²/jor Suarez SalazarPisos loseta 10×20×1.0 a 2.0 cm m² 6 7m²/jor Suarez SalazarPisos loseta 30×30×2.5 cm m² 6 13m²/jor Suarez SalazarPisos Mosaico 20×20×2 cm m² 6 11m²/jorPisos mosaico terraza sin junta m² 6 9.5 Suarez Salazar metálica 50×50×2.5 cmZoclo mosaico 10×20×2.0 cm m 6 18m/jor Suarez SalazarZoclo loseta 10×15×30 a 40 cm m 6 18m/jor Suarez Salazar

MaterlinadosMaterlinado fino sobre pisos m² 1 4m²/jor Suarez SalazarMaterlinado fino sobre muros m² 1 3m³/jor Suarez SalazarMaterlinado fino sobre trabes y losas m² 4 2m²/jor Suarez SalazarConcepto Unidad Grupo de Rendimiento Fuente de

trabajo ConsultaAzoteas

Rellenos de Tezontle en Azoteas m³ 1 2m³/jor Suarez Salazaresntornado sobre casco m² 5 20m²/jor Suarez SalazarEnladrillado y Escobillado m² 5 11m²/jor Suarez SalazarEnladrillado aparente m² 5 7m²/jor Suarez SalazarChaflanes de pedacería 5 24m/jor Suarez Salazar

VariosHechura Tarimas 50×100cm pza 3 19pza/jor Suarez SalazarMuro Block vidrio 10×20×20cm m² 6 3.5m²/jor Suarez SalazarIncluyendo refuerzo en juntasRegistros de 40×60 cm con pza 5 2pza/jor Suarez Salazarprofundidad promedio de 1.25mTapa de registro de 40×60 cm pza 5 6pza/jor Suarez SalazarImpermiabilización de cimientos m 2 35m/jor Suarez SalazarAlbañales 15 cm. Ø tendido y junteo m 5 26m/jor Suarez SalazarColocación de Herrreria m² 5 7.5m²/jor Suarez SalazarImpermiabilización azotea por capa. m² 2 30m²/jor Suarez SalazarColado firme 5cm m² 5 21.90m²/jor Inv. de campo Teh.Colado firme 10cm m² 5 19.92m²/jor Inv. de campo Teh.Pulido fino con llana m² 5 12m²/jor Inv. de campo Teh.Repellado mort. 1:1:8 m² 5 9m²/jor Inv. de campo Teh.piso azulejo m² 6 4m²/jor Inv. de campo Teh.cerámica pasta 20×20 m² 6 7.50m²/jor Inv. de campo Teh.Yeso Plafón reventon m² 5 20m²/jor Inv. de campo Teh.Yeso muros m² 5 18.50m²/jor Inv. de campo Teh.Limpieza gruesa Obra m² 1 50m²/jor Inv. de campo Teh.Acero columnas 1/4" kg 4 75kg/jor Inv. de campo Teh.

Page 14: Rendimiento Mano de Obra

Acero columnas 5/16" kg 4 68.32kg/jor Inv. de campo Teh.Acero columnas 3/8" kg 4 120kg/jor Inv. de campo Teh.Acero columnas 1/2" kg 4 140kg/jor Inv. de campo Teh.Acero coumnas 5/8" kg 4 150kg/jor Inv. de campo Teh.Acero columnas 3/4" kg 4 163.98kg/jor Inv. de campo Teh.Acero columnas 1" kg 4 200kg/jor Inv. de campo Teh.Cimb. Y Des. Trabes m² 3 4.25m²/jor Inv. de campo Teh.Cimb. Y Des. Rampa esc m² 3 30m²/jor Inv. de campo Teh.Cimb. Desc.Losas m² 3 6.91m²/jor Inv. de campo Teh.Relleno tepetate m³ 5 2.07m³/jor Inv. de campo Teh.chaflan pulido pedac. ml 5 15ml/jor Inv. de campo Teh.inst.tubo drenaje 20cm viv. ml 5 20ml/jor Inv. de campo Teh.Relleno y comp. Albañal m³ 1 2.85m³/jor Inv. de campo Teh.registro pref. 40 × 60 t. Ciega pza 5 6pza/jor Inv. de campo Teh.plantilla prm.100 y 5cm m² 5 21.90/jor Inv. de campo Teh.pasos albañal en cimiento pza 5 5.50pza/jor Inv. de campo Teh.Mamp. Piedra braza mort, 1:5 m³ 5 2.05m²/jor Inv. de campo Teh.Zap. Y contr. Hab. Acero 1/4 kg 5 75kg/jor Inv. de campo Teh.Zap. Y contr. Hab. Acero 5/16 kg 5 100kg/jor Inv. de campo Teh.Zap. Y contr. Hab. Acero 3/8 kg 5 120kg/jor Inv. de campo Teh.Zap. Y contr. Hab. Acero 1/2 kg 5 140kg/jor Inv. de campo Teh.Zap. Y contr. Hab. Acero 5/8 kg 5 150kg/jor Inv. de campo Teh.Zap. Y contr. Hab. Acero 1 kg 5 200kg/jor Inv. de campo Teh.Colado conc.inc.vibr.cimient m³ 2 8.51m³/jor Inv. de campo Teh.Cimb.y desim. Zap. y contra. m² 5 6m²/jor Inv. de campo Teh.Relleno prod. Excav. Capas 20cm m³ 5 2.85m³/jor Inv. de campo Teh.Arm cim vac dalas 15 × 15 1n ml 5 7.37ml/jor Inv. de campo Teh.Concepto Unidad Grupo de Rendimiento Fuente de

trabajo ConsultaArm cim vac dalas 15 × 15 2n ml 5 6.71ml/jor Inv. de campo Teh.tab. rojo común 14c mort 1:5 bar 1n m² 5 3.60m²/jor Inv. de campo Teh.tab. rojo común 14c muro 1n m² 5 7.50m²/jor Inv. de campo Teh.tab. rojo común 14c muro 2n m² 5 6.82m²/jor Inv. de campo Teh.cimb. Y desc. Col.1n m² 5 4.25m²/jor Inv. de campo Teh.cimb. Y desc. Col niv sub. m² 5 3.87m²/jor Inv. de campo Teh.fab. Conc. 100 - 300 kg /cm² m³ 5 17.28m³/jor Inv. de campo Teh.sum. Col. Malla 6 × 6 - 6/6 m² 5 120m²/jor Inv. de campo Teh.sum. Col. Malla 6 × 6 - 10/10 m² 5 158.75m²/jor Inv. de campo Teh.armex cualquier dimención ml 5 100.85ml/jor Inv. de campo Teh.limpieza de terreno a mano m² 1 150m²/jor Inv. de campo Teh.limpieza de terreno accidentado m² 1 75m²/jor Inv. de campo Teh.trazo m² 5 250m²/jor Inv. de campo Teh.nivelación a mano m² 5 250m²/jor Inv. de campo Teh.excav, a mano T1 0 al .50 m³ 1 4m³/jor Inv. de campo Teh.excav. A mano T2 0 al .50 m³ 1 2.24m³/jor Inv. de campo Teh.excav. A mano T3 0 al .50 m³ 1 1.50m³/jor Inv. de campo Teh.afine de terraseria a mano m² 1 22.50m²/jor Inv. de campo Teh.excav. Albañal vivienda m³ 1 2.24m³/jor Inv. de campo Teh.ceja de tabique rojo en muros de 14 cm ml 5 28.57ml/jor Plazolaceja de tabique Sta. Julia en sentido vertical ml 5 6.67 ml/jor Plazola

Page 15: Rendimiento Mano de Obra

ceja de tabique rojo,muros 14 cm, pulido ml 5 10.53 ml/jor Plazolaceja ladrillo comprimido frente 20x2.5 cm ml 5 14.29ml/jor Plazolaceja tabique comprimido frente 5x10cm ml 5 6.67ml/jor Plazola

Registros Arenero de 40x40x60 cm de profundidad, de m² 5 2.42 Plazolatabique comun, pulido con mortero cementoarena 1:5 tabique asentado con c-a 1:5Registro de albañal de 40x60x1.00m prof. m² 5 1.342 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6Registro de albañal de 40x60x1.50m prof. m² 5 0.887 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6Registro de albañal de 60x60x1.00m prof. m² 5 1.106 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6Registro de albañal de 60x60x1.50m prof. m² 5 0.735 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6Registro de albañal de 60x60x2.00m prof. m² 5 0.565 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6Registro de albañal de 60x90x1.00m prof. m² 5 0.875 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6Registro de albañal de 60x90x1.50m prof. m² 5 0.615 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6Registro de albañal de 60x90x2.00m prof. m² 5 0.453 Plazolapulido mortero c-a 1:5, tabique asentadocon mortero c-a 1:6

Concepto Unidad Grupo de Rendimiento Fuente detrabajo Consulta

Tapas de registroTapa de registro de albañal de 40x40x5 cm pza 5 6.13 Plazolaconcreto f'c=140 armado con alambron 1/4"marco y contramarco de angulo 1"x1"x1/8"Tapa de registro de albañal de 40x60x8 cm pza 5 28.57 Plazolaconcreto f'c=140 armado con alambron 1/4"Tapa de registro de albañal de 60x60x8 cm pza 5 19.23 Plazolaconcreto f'c=140 armado con varilla 3/8"Tapa de registro de albañal de 90x90x8 cm pza 5 10 Plazolaconcreto f'c=140 armado con varilla 3/8"Tapa de registro de albañal de 40x60x5 cm pza 5 14 Plazolaconcreto f'c=140 armado con alambron 1/4"marco y contramarco de angulo 1"x1"x1/8"Tapa de registro de albañal de 50x60x5 cm pza 5 12.5 Plazolaconcreto f'c=140 armado con alambron 1/4"

Page 16: Rendimiento Mano de Obra

marco y contramarco de angulo 1"x1"x1/8"Tapa de registro de albañal de 60x60x5 cm pza 5 11 Plazolaconcreto f'c=140 armado con alambron 1/4"marco y contramarco de angulo 1"x1"x1/8"Tapa de registro de albañal de 60x90x6 cm pza 5 8.2 Plazolaconcreto f'c=140 armado con alambron 1/4"marco y contramarco de angulo 1"x1"x1/8"Tapa de registro de albañal de 90x90x8 cm pza 5 5.29 Plazolaconcreto f'c=140 armado con varilla 3/8"marco y contramarco de angulo 1"x1"x1/8"

Instalacionesconexión para bombas unid 6 1.25 Plazolapaso de agua fierro galvanizado ced. 40 unid 6 1 Plazolainstalación para tinaco con tuberia galv. unid 6 1 Plazolainstalación para calentador tipo A unid 6 2 Plazolainstalación para calentador tipo B unid 6 2.5 Plazolainstalación para calentador tipo C unid 6 2.5 Plazolainstalación regaderas con tuberia galv. unid 6 1 Plazolainstalación de fregadero sin considerar unid 6 1 Plazolamueble, material fierro galvanizadoalimentacion y desague de lavabos unid 6 0.286 Plazolainstalación para WC con llave de resorte sinconsiderar mueble, material fierro galv unid 6 0.87 PlazolaAcabado con Voltedor m of albañil 92.00Cimbra metalica en ambas caras

Fuentes de consulta

1.- Costo y Tiempo en edificacion Suarez Salazar2.-Normas y costos en construcción Plazola3.-Investigacion de campo en la región de Tehuacan

Grupos de trabajo:

Actividades Gpo IntegrantesExcavaciones, acarreos, rellenos 1 1/10 cabo + 1 peonPlantillas, firmes, vaciado de concreto 2 1/4 of. Albañil + 1 peonCimbra de cimentacion, columnas, etc. 3 1 of. Carpintero + 1 peonAcero en cimentacion, columnas, trabes 4 1/2 of. Fierrero + 1 peonCimentacion de piedra, dalas, muros, etc. 5 1 of. Albañil + 1 peonPisos, terrazo, azulejo, ceramica, etc. 6 1 of. Especialista + 1 peon

Page 17: Rendimiento Mano de Obra

dimensiones de tabique: 6 x 14 x 26

a= 6 cmb= 26 cmc= 14 cmz= 1.6 cm

No. De Pzas.= 1/ [(b+z)(a+z)] Se le agrega un 10% de desperdicio

No. De Pzas.= 47.67 pzas/ m2No. De Pzas. + 10%= 52.44 pzas/ m2

Mortero

m3/pza= zc (b+z+a) m3/pza 0.0007526

m3/m2= 0.039 mas 30% de desperdicio

mortero= 0.051 m3/m2CONCRETO

DIMENSIONES DE LA CAJA No. V: losa de concreto de f´c=200 kg/cm2A= 1.30 SUPERF I= 4.55 M2 Area= 1.498B= 0.90 SUPERF II= 3.15 M2 espesor= 0.15H= 1.75e= 0.14 SUPEFICIE TOTAL= 7.7 M2

PZA TOTALES DE TABIQUE: 403.79 pzas Volumen= 0.247 m3TOTAL DE MORTERO: 0.3951 m2

CONCRETODIMENSIONES DE LA CAJA No. I:A= 0.70 SUPERF I= 1.19 M2 Area= 0.706B= 0.70 SUPERF II= 1.19 M2 espesor= 0.15H= 0.85e= 0.14 SUPEFICIE TOTAL= 2.38 M2

PZA TOTALES DE TABIQUE: 124.81 pzas Volumen= 0.116 m3TOTAL DE MORTERO: 0.1221 m2

CONCRETODIMENSIONES DE LA CAJA No. II:A= 1.00 SUPERF I= 0.5 M2 Area= 1.186B= 0.90 SUPERF II= 0.45 M2 espesor= 0.15H= 0.25e= 0.14 SUPEFICIE TOTAL= 0.95 M2

PZA TOTALES DE TABIQUE: 49.819 pzas Volumen= 0.196 m3TOTAL DE MORTERO: 0.0487 m2

Page 18: Rendimiento Mano de Obra

ACEROvarilla 3/8" @20 cm en piso peso 3/8=num de Var: 7.2 x 1.30 = 9.36 x 0.56 = 5.242num de Var: 5.2 x 0.90 = 4.68 x 0.56 = 2.621varilla 3/8" @10 cm en losa tapanum de Var: 14.4 x 1.30 = 18.72 x 0.56 = 10.48num de Var: 10.4 x 0.90 = 9.36 x 0.56 = 5.242

peso total de varilla 25.95 kg

ACEROvarilla 3/8" @20 cm en piso peso 3/8=num de Var: 4.2 x 0.70 = 2.94 x 0.56 = 1.646num de Var: 4.2 x 0.70 = 2.94 x 0.56 = 1.646varilla 3/8" @10 cm en losa tapanum de Var: 8.4 x 0.70 = 5.88 x 0.56 = 3.293num de Var: 8.4 x 0.70 = 5.88 x 0.56 = 3.293

peso total de varilla 10.87 kg

ACEROvarilla 3/8" @20 cm en piso peso 3/8=num de Var: 5.7 x 1.00 = 5.7 x 0.56 = 3.192num de Var: 5.2 x 0.90 = 4.68 x 0.56 = 2.621varilla 3/8" @10 cm en losa tapanum de Var: 11.4 x 1.00 = 11.4 x 0.56 = 6.384num de Var: 10.4 x 0.90 = 9.36 x 0.56 = 5.242

peso total de varilla 19.18 kg

Page 19: Rendimiento Mano de Obra

Tabla de 1"x10"x8 1/4´

CIMBRA Tabla 1 10 8 1/4ancho 0.254 mNum pzas= 3.543

Pt= 12.6 ptTabla de 1"x10"x8 1/4´

CIMBRA Tabla 1 10 8 1/4ancho 0.254 mNum pzas= 2.756

Pt= 5.275 pt

Tabla de 1"x10"x8 1/4´

CIMBRA Tabla 1 10 8 1/4ancho 0.254 mNum pzas= 0.984

Pt= 2.422 pt

Page 20: Rendimiento Mano de Obra

REND.Cuadrilla No 2: ( 1.00 Péon + 1/10 cabo ). 5Cuadrilla No 3 (1 Carpintero + 1 Ayudante general) 9Cuadrilla No 27 (1 Albañil + 5 Peones) 7.5Cuadrilla 40: (1.00 Of. Albanil) 34

60

210

47

80

Motoniveladora marca Caterpillar modelo 12G, motor diesel de 140 hp hoja de 3.66 m*0.61, vel. 1a 3.8 Km/h, 2a. 4.8 Km/h

Motoniveladora marca Caterpillar modelo 12G, motor diesel de 140 hp hoja de 3.66 m*0.61, vel. 1a 3.8 Km/h, 2a. 4.8 Km/h

Motoniveladora marca Caterpillar modelo 12G, motor diesel de 140 hp hoja de 3.66 m*0.61, vel. 1a 3.8 Km/h, 2a. 4.8 Km/h

Compactador de suelos de tambor liso vibratorio marca AMMANN modelo AC 110 de 121 hp y 10.90 ton de peso de operacion y 2.29 m de ancho del tambor, vel. max. trabajo 8 kph

Camion pipa de 10000 lts sobre Chasis cabina Mercedez-Benz L-1417/52 STD 170 HP

Page 21: Rendimiento Mano de Obra

RELLENO COMPACTADO DE TIERRA LIMPIA M3CIMBRA PARA CIMENTACION M2CONCRETO HECHO EN OBRA M3ACABADO ESCOBILLADO M2

EXCAVACION EN CAJA M2

ESCARIFICADO O RASTREO M3

M3

COMPACTACION DE TERRENO NATURAL

OPERACIÓN DE TENDIDO, CONFORMACION Y AFINAMIENTO PARA EL ACABADO SUPERFICIAL.

Page 22: Rendimiento Mano de Obra

limpieza general del terreno 50 m2/j