Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan...

60
Annex-Figures

Transcript of Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan...

Page 1: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

Annex-Figures

Page 2: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …
Page 3: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-1

Annex-F 2.1.1 Distribution of Elevation Zones in the Study Area

Page 4: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-2

Annex-F 2.1.2 Distribution of Slope Category in the Study Area

Page 5: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-3

Annex-F 2.2.1 Principal Sub-basins in the Study Area

Page 6: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-4

0

Calumpit

Massim R.

45.6

San Miguel R.

Bamban R. Baliwag R.

Talavera R.

Rio Chico R.

Angat R.

Pasac R.

Tabualing R. Cabu R. Digmala R.

Coronell R.

Sumacbao R.

Penaranda R.

MasiwayDam

PantabanganDam

PAM01PAM01

PAM02PAM02

PAM03PAM03

PAM04PAM04 PAM05PAM05 PAM06PAM06

PEN01PEN01

COR01COR01

RCH01RCH01

21.0

45.8

71.2

101.5 117.6 149.2 172.6 182.9

208.2 214.9 264.60 0

58.3 72.4

0 0 0

30.6 58.5 32.2

25.4

67.2

72.7

0

0

0

67.2

0

9.7

52.8

0 0

158.444.9

64.0

Note: Number shows distance in km from downstream end of a river.

0

Calumpit

Massim R.

45.6

San Miguel R.

Bamban R. Baliwag R.

Talavera R.

Rio Chico R.

Angat R.

Pasac R.

Tabualing R. Cabu R. Digmala R.

Coronell R.

Sumacbao R.

Penaranda R.

MasiwayDam

PantabanganDam

PAM01PAM01

PAM02PAM02

PAM03PAM03

PAM04PAM04 PAM05PAM05 PAM06PAM06

PEN01PEN01

COR01COR01

RCH01RCH01

21.0

45.8

71.2

101.5 117.6 149.2 172.6 182.9

208.2 214.9 264.60 0

58.3 72.4

0 0 0

30.6 58.5 32.2

25.4

67.2

72.7

0

0

0

67.2

0

9.7

52.8

0 0

158.444.9

64.0

0

Calumpit

Massim R.

45.6

San Miguel R.

Bamban R. Baliwag R.

Talavera R.

Rio Chico R.

Angat R.

Pasac R.

Tabualing R. Cabu R. Digmala R.

Coronell R.

Sumacbao R.

Penaranda R.

MasiwayDam

PantabanganDam

PAM01PAM01

PAM02PAM02

PAM03PAM03

PAM04PAM04 PAM05PAM05 PAM06PAM06

PEN01PEN01

COR01COR01

RCH01RCH01

21.0

45.8

71.2

101.5 117.6 149.2 172.6 182.9

208.2 214.9 264.60 0

58.3 72.4

0 0 0

30.6 58.5 32.2

25.4

67.2

72.7

0

0

0

67.2

0

9.7

52.8

0 0

158.444.9

64.0

Note: Number shows distance in km from downstream end of a river.

Source: JICA Study Team

Annex-F 2.2.2 Schematic River System in Pampanga Main River System

0

100

200

300

400

500

600

700

800

900

1000

0 50 100 150 200 250 300

Distance (km)

Ele

vatio

n (m

Pampanga R.

PantabanganDam

Masiway Dam

PAM01less than1/10,000

PAM021/10,000 -1/5,000

Massim R.

San Miguel R.

Rio Chico R.incl. Talavera R.

Baliwag R.

Bamban R.

Penaranda R.

Sumacbao R.

Tabualing R.

Cabu R.

Coronell R.

Digmala R.

PAM041/2,500 -1/1,000

PAM031/5,000 -1/2,500

PAM051/1,000 -

1/400

PAN01more than

1/400

Ele

vatio

n(m

)

Source: JICA Study Team

Annex-F 2.2.3 Longitudinal Profile of the Main Rivers in Pampanga Main River System

Page 7: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-5

0

BustosWeir

Bayabas R.

Angat R.AngatDamIpo Dam

16.5

LabanganFloodway

45.5 56.1 83.1 91.1

Angat R.0

37.9

152.7

ANG02ANG02ANG01ANG01 ANG03ANG03

Note: Number shows distance in km from downstream end of a river.

Bagbag R.

Pampanga R.

0

BustosWeir

Bayabas R.

Angat R.AngatDamIpo Dam

16.5

LabanganFloodway

45.5 56.1 83.1 91.1

Angat R.0

37.9

152.7

ANG02ANG02ANG01ANG01 ANG03ANG03

Note: Number shows distance in km from downstream end of a river.

Bagbag R.

Pampanga R.

Source: JICA Study Team

Annex-F 2.2.4 Schematic River System in Angat River System

0

100

200

300

400

500

600

700

800

0 20 40 60 80 100 120 140 160

Distance (km)

Ele

vatio

n (m

Angat R.

Angat Dam

Ipo Dam

Bayabas R.

ANG01less than1/2,000

ANG021/,2000 - 1/300

ANG03more than 1/300

LabanganFloodway

Conf. with Bagbag River

Bustos Weir

Ele

vatio

n(m

)

Source: JICA Study Team

Annex-F 2.2.5 Longitudinal Profile of the Main Rivers in Angat River System

Page 8: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-6

0

Pasig-Potrero R.

Abacan R.

5.0

11.0

37.7

Note: Number shows distance in km from downstream end of a river.

Pampanga R.

San Fernando R.

Porac R.Gumain R.

Pasac R.

Guagua R.

Bebe-San Esteban Cutoff Channel

71.7

00

81.8

8.1

0

21.3

56.4

0

43.6

PAS01PAS01

Manapi Mesapinit R.0

Pasig-Potrero R.

Abacan R.

5.0

11.0

37.7

Note: Number shows distance in km from downstream end of a river.

Pampanga R.

San Fernando R.

Porac R.Gumain R.

Pasac R.

Guagua R.

Bebe-San Esteban Cutoff Channel

71.7

00

81.8

8.1

0

21.3

56.4

0

43.6

PAS01PAS01

Manapi Mesapinit R.

Source: JICA Study Team

Annex-F 2.2.6 Schematic River System in Pasac River System

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

0 10 20 30 40 50 60 70 80 90 100

Distance (km)

Ele

vatio

n (m

Pasac R. incl. Abacan R.

Porac R.

Guagua R.incl. Pasig-Potrero R.Gumain R.

1/501/25 1/100

Ele

vatio

n(m

)

Source: JICA Study Team

Annex-F 2.2.7 Longitudinal Profile of the Main Rivers in Pasac River System

Page 9: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-2-7

Annex-F 2.3.1 Location of Meteorological Stations

Page 10: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-8

0

1000

2000

3000

4000

5000

6000

7000

1951

1953

1955

1957

1959

1961

1963

1965

1967

1969

1971

1973

1975

1977

1979

1981

1983

1985

1987

1989

1991

1993

1995

1997

1999

2001

2003

2005

2007

Ann

ual p

reci

pita

tion

(mm

)

Cabanatuan Science Garden Infanta Iba

Source: JICA Study Team based on PAGASA data

Annex-F 2.3.2 Change in Annual Total Precipitation at Key Stations

Page 11: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-9

Annex-F 2.3.3 Climate Zones

TTyyppeeⅠⅠ 

TTyyppeeⅢⅢ  

TTyyppeeⅡⅡ 

Page 12: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-10

Annex-F 2.3.4 Spatial Distribution of Annual Total Precipitation

Page 13: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-11

Annex-F 2.3.5 Spatial Distribution of Precipitation in Dry Season

Page 14: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-12

Annex-F 2.3.6 Spatial Distribution of Precipitation in Wet Season

Page 15: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-13

2.1 Hydrology

Annex-F 2.4.1 Location of Hydrometric Stations

Page 16: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-14

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0 2,000 4,000 6,000 8,000 10,000

A (km2)

q (m3/s/km

P-PET<TRO<P

TRO<P-PET

q (m3 /s

/km2 )

1951 - 1973Angat Dam Catchment

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0 2,000 4,000 6,000 8,000 10,000

A (km2)

q (m3/s/km

P-PET<TRO<P

TRO<P-PET

q (m3 /s

/km2 )

1974 - 2007Angat Dam Catchment

Source: JICA Study Team

Annex-F 2.4.2 Specific Discharge

Page 17: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-15

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0 2,000 4,000 6,000 8,000 10,000

A (km2)

C (-)

P-PET<TRO<P

TRO<P-PET

C(-)

1951 - 1973Angat Dam Catchment

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0 2,000 4,000 6,000 8,000 10,000

A (km2)

C (-)

P-PET<TRO<P

TRO<P-PET1974 - 2007Angat Dam Catchment

C(-)

Source: JICA Study Team

Annex-F 2.4.3 Runoff Rate

Page 18: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-16

2.2 Geology

Annex-F 2.5.1 Geological Map

Page 19: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-17

2.3 Hydrogeology

Annex-F 2.6.1 Hydrogeology Map

Page 20: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-2-18

2.10

Annex-F 2.10.1 Flood Area in Typhoon Marce, August 2004

Page 21: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-3-1

Annex-F 3.1.1 Population Density of Each of Municipalities in the Study Area

Page 22: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-3-2

Annex-F 3.3.1 Land Cover in the Study Area

Page 23: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-3-3

Annex-F 3.4.1 Location of Water Permits for Surface Water

Page 24: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-3-4

Annex-F 3.4.2 Location of Water Permits for Groundwater

Page 25: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-3-5

Annex-F 3.6.1 Status of AD/AL (Ancestral Land) Delineation and Titling in and around the Study

Area as of March 9, 2010

Page 26: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …
Page 27: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-1

T_UMI01

T_UMI02T_UMI03ANG03

ANG0204

ANG0203

N

S

W E

0 5 km

Angat storage dam

Ipo dam

Angat R.

Catchment of Angat storage damA=546km2

Umiray R.

Catchment of diversion point of Umiray trans-basinA=161km2

A1=130km2

A2=6km2

A3=25km2

A1

A2A3

Intake1-Umiray R.

Intake2-Alia R.(not yet completed)

Intake3-Sumag R.(not yet completed)

To Bustos dam

To MWSS

Main tunnel

Angat Inflow1) Self-catchment Qin=59.3m3/s (1,869MCM/y)(observed average in 1968-2007)2) Umiray trans-basin Qin=11.7m3/s(370MCM/y)(observed average in 2001-2003, 2006-2007)

Effective storage volume = 850MCM

H=131m

EL 212m (Dry season)

(Veff=738MCM)

EL 160m (Veff=0MCM)

EL 210m (Wet season)

(Veff=696MCM)

EL 219m (Veff=894MCM)

Dead volume

EL 180m (lower limit of operation of main power unit) (Veff=206MCM)

Flood control volume

Conservation volume (Domestic & Irrigation & Power)

206MCM

490MCM532MCM

42MCM

Angat dam

Supplied either by main turbine or through Ipo dam

Supplied only through Ipo dam

Surcharge volume 156MCM

Source: JICA Study Team

Annex-F 4.1.1 Location and Dimension of Angat Storage Dam

Page 28: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-2

T_CAS

PAN01

T_AUR

CH0104

PAM0501

PAM0503

PAM0502

N

S

W E

0 5 km

Pantabangan storage dam

Catchment of Pantabangan storage dam + Masiway damA=869km2 Pantabangan Inflow

1) Self-catchment +Aurola trans-basinQin=38.4m3/s (1,195MCM/y)(observed average in 1980-2008)2) Casecnan trans-basin Qin=23.8m3/s(752MCM/y)(observed average in 2002-2008)

Effective storage volume = 2,775MCM

Aguang R.Canili

Diayo

Aurola trans-basin channel

Masiway dam

To Bongabon dam

Casecnan R.

Abaca

Denip

Catchment of diversion point of Casecnan trans-basinA=570km2

Catchment of diversion point of Aurola trans-basinA=68km2

Pampanga R.

Rizal dam

H=107m

EL 221m (Dry season)

(Veff=2,087MCM)

EL 170m (Veff=0MCM)

EL 216m (Wet season)

(Veff=1,757MCM)

EL 230m (Veff=2,775MCM)

Dead volume(225MCM)

Flood control volume

Conservation volume(Irrigation & Power)

1,757MCM 2,087MCM

330MCM

688MCM

Pantabangan dam

Surcharge volume

Source: JICA Study Team

Annex-F 4.1.2 Location and Dimension of Pantabangan Storage Dam

Page 29: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-3

Annex-F 4.1.3 Location of Proposed Large Storage Dam Sites

Page 30: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-4

Annex-F 4.2.1 Location Map of Existing NIS

Page 31: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-5

UPRIISDiv-V

(16,879ha)

UPRIISDiv-I

(16,400ha)

UPRIISDiv-II

(22,591ha)

AMRISLeft Bank

(10,128ha)

AMRISRight Bank(16,663ha)

Pantabangan Dam

Masiway Dam

Rizal Dam

Angat DamBustos Dam

Super Diversion Canal

UPRIISDiv-I

(4,120ha)

Talavera Dam

Pam

pang

a R

iver

Maasim River

Manila bay

PDRIS(6,604ha)

Angat River

TASMORIS(4,200ha)

Tar

lac

Riv

er

O'D

onne

l Riv

er

Smoris Dam

Taris Dam

Porlac RIS(1,458ha)

Gumain RIS(1,629ha)

Gumain Dam

Solib Dam

Porlac Dam

Gumain River

Porlac River

Chi

co R

iver

Tal

aver

a R

iver

UPRIISDiv-III

(25,881ha) AuloSRIP

(810ha)

UPRIISDiv-IV

(19,924ha)

Aulo Dam

Aulo River

Penaranda River

PenarandaDam

Bongabon (Atate) Dam

Cong Dadong Dam

Source : JICA Study Team

Annex-F 4.2.2 Schematic Flow Diagram of Existing NIS

Page 32: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-6

Annex-F 4.2.3 Location Map of CIS

Page 33: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-7

Annex-F 4.2.4 Location Map of Small Scale Irrigations under BSWM

Page 34: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-8

Annex-F 4.2.5 Location Map of Projected NIS

Page 35: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-9

UPRIISDiv-V

(37,200ha)

UPRIISDiv-I

(16,400ha)UPRIIS

Div-II(22,591ha)

UPRIISDiv-III

(25,881ha) AuloSRIP

(810ha)

AMRISLeft Bank

(10,128ha)

AMRISRight Bank(16,663ha)

UPRIISDiv-IV

(19,924ha)

Pantabangan Dam

Masiway Dam

Rizal Dam

Aulo Dam

Angat DamBustos Dam

Super Diversion Canal

Aulo River

Penaranda River

UPRIISDiv-I

(4,120ha)

Talavera Dam

Pam

pan

ga R

iver

Maasim River

PenarandaDam

Bongabon (Atate) Dam

Manila bay

PDRIS(6,604ha)

Angat River

TASMORIS(39,150ha)

Tar

lac

Riv

er

O'D

onne

l Riv

er

Smoris Dam

Taris Dam

Porlac-Gumain

(16,750ha)

Gumain Dam

Solib Dam

Porlac Dam

Gumain River

Porlac River

Chi

co R

iver

Tal

aver

a R

iver

Balog-Balog Dam

Gumain Reservoir

Balintingon Dam

Balintingon(14,900ha)

Diversion Dam

Cong Dadong Dam

Existing Dam

Proposed Dam

Source : JICA Study Team

Annex-F 4.2.6 Schematic Flow Diagram of Projected NIS

Page 36: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-10

Annex-F 4.3.1 Present Coverage of Water Supply Facilities for Access to Safe Drinking Water

Page 37: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-11

Annex-F 4.3.2 Present Coverage of Level 3 Water Supply Facilities with Safe Water Access

Page 38: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-12

Annex-F 4.3.3 Present Coverage of Sanitary Toilet

Page 39: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-13

N

S

W E

0 1 km

Angat Storage DamAngat river

To Bustos dam

Ipo dam

Main Unit(200MW)

To MWSS

Main Pipe

Auxiliary Unit (46MW)

ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway

Release to Release to BustosBustos1- HPP (Main Unit)

N

S

W E

0 1 km

Angat Storage DamAngat river

To Bustos dam

Ipo dam

Main Unit(200MW)

To MWSS

Main Pipe

Auxiliary Unit (46MW)

ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway

Release to Release to BustosBustos1- HPP (Main Unit)

PAM0503

N

S

W E

0 1 km

PantabanganStorage Dam

Pampanga river

Power house-1(100MW)

Power house-2(12MW)

Masiway dam

Casec

nan

tran

s-ba

sin

tunn

el

CasecnanHydropower plant(150MW)

PAM0503

N

S

W E

0 1 km

PAM0503

N

S

W E

0 1 km

PantabanganStorage Dam

Pampanga river

Power house-1(100MW)

Power house-2(12MW)

Masiway dam

Casec

nan

tran

s-ba

sin

tunn

el

CasecnanHydropower plant(150MW)

Source: JICA Study Team

Annex-F 4.4.1 Existing Hydropower Plants in the Study Area

Page 40: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-14

Annex-F 4.5.1 Completed Major Flood and Sediment Disaster Prevention Works

Page 41: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-4-15

Annex-F 4.5.2 Hydrological Gauging and Repeater Stations for Completed and On-going Flood

Forecasting and Warning System in Pampanga River Basin

Page 42: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-4-16 Boundary of Study Area

Road

Widening of ThirdRiver Channel(PHUMP Phase IV)

Excavation ofPasac River(PHUMPPhase IV)

Construction ofPorac-GumainDiversion Channel(PHUMP Phase III)

Channel Excavation /Dredging(PHUMP Phase III)

DrainageImprovement for SanFernando River(PHUMP Phase IV)

Ara

yat-

Apa

lit-

Mas

anto

l(E

xist

ing)

Setb

ack

Leve

e

Hagonoy-Calumpit-PlaridelLevee (Existing)

Widening/Construction ofLevee for Pmapanga River(PDDP FC Phase III)

Widening/Construction ofLevee for Angat River(PDDP FC Phase II)

Widening/Construction ofLevee for Pmapanga River(PDDP FC Phase II)

Widening/Construction ofLevee for Pmapanga River(PDDP FC Phase I)Completed

Widening/Construction ofLevee for Bagbag River(PDDP FC Phase II)

Widening/Construction ofLevee for LabanganFloodway(PDDP FC Phase II)

Eastern Megadike

Western M

egadike

Pasig-Potrero River

Transvere

se

Dike

G. S. O

. Roa

d

Tail Road

Abacan River

San F

ernan

do

River

Porac-Gumain River

Bebe San EasterbanShort Cut Channel

Pasa

c R

iver

Pam

pang

a R

iver

Lab

anga

n F

lood

wa y

Angat River

Pam

pang

a R

ive r

Porac River

Gum

ain River

Manila Bay

Source: PHUMB-Phase II, Monitoring and Pllaning ofFlood Control Works on Pasac Delta and Third RiverChannel,JICA,2002

Completed FloodMitigation Project

On-going and Proposed FloodMitigation Project

LEGEND

River

Annex-F 4.5.3 On-going and Proposed Structural Flood Mitigation Works in Pampanga River Basin

Page 43: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-5-1

.1.3Institutional-Setup for Water Resources Management

T Legislative Arrangements

5.2 Present Organization Setup

Source: Philippine Water Supply Sector Road Map, p.19, modified by JICA study

Annex-F 5.2.1 Functional Chart of Water Related Agencies in the Philippines

Policy Making & Planning

NEDA

Coordination / Regulation

NWRB

Integrated Area Development

LLDA RDCs BOI PEZA

RBCO

Watershed Management

FMB BSWM NIA NPC

PAWB

Water Quality & Sanitation

EMB DOH BRL EHS LGUs MWSS LWUA-WDs

Irrigation

NIA DA BSWM

Hydro Power

DOEPSALM NPC PEMC

Water Supply

NAPC-WASCO DOF-CDA

DBP DAR DPWHMWSS LWUA-WDs PTAHUDCC DILG-PMO

PEZALGU’s

Data Collection

NWRB BRS NAMRIALWUA MGBPAGASA

MWSS NIA

Research

DOST-PCAFNRRD ERDB

Cloud Seeding

PAF BSWM

Flood Management

DPWH-PMO OCD-NDCC

PAGASA MMDA

Fisheries & Recreation

BFAR PTA

Ports & Navigation

PPA

DENR NEDA DOF DOJ DOH

NHRC Exec. Dir., NWRB

Members

Page 44: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-5-2

Function of Local Government

OFFICE OF THE PRESIDENT

DBM Budgeting

DOF Funding

Water Users

DILG DOH DPWH DA DENR Environment

& Watershed

DOE

FMB

NEDA Planning

MGB EMB

Regional Offices

PMOPMONIA NPC NEA

Hydropower Dam

Office

Regional Irrigation

Office

Regional Office

Regional Health Office

LWUA

Urban Water

Districts

Provincial Hospital

District Engineer’s

Office

MWSSPLG OO

RENRO

PENRO

CENRO

Provincial Infrastructures

(Roads, Utilities, Flood Control, Irrigation, etc.)

Concessionaries in

Metro ManilaMLG OOCLG OO

NWRB Water Rights & Regulation

of CPC Holders

Municipal/ City

LGUs

LGUs

Water Supply

ProvidersLGU Owned/

Operated

Provincial Health Office

Rural Health Office

Sanitation & Water Quality Control

Irrigation Management Office (IMO)

ERDBPAWB

Communal Irrigation System

Annex-F 5.2.2 Functional Relationship among Central Government Agencies and Local Governments Source; JICA Study Team

Page 45: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-5-3

Annex-F 5.2.3 Organizational Chart of Province of Pampanga

Page 46: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-5-4

Annex-F 5.3.1 Flowchart for Processing of Water Permit Application Source: NWRB

File ApplicationWith Documents

Agriculture Purpose

Hydropower Industrial Purpose

DomesticPurpose

RecreationalFisheriesPurpose

DrainagePurpose

Determine Compliance w/ requirements

Posting of Application

Is thereProtest?

Hearings Adjudication/ Decision by the Board

Technical Appraisal by Deputized Agencies

Obtain clearance From other agencies

In favor ofApplicant?

Return Application

Papers

Is source fromGroundwater?

Issue Permitto Drill

Submit welldata toNWRB

TechnicalEvaluation byNWRB staff

NWRB staffrecommendedTo the Board

Board Decides

Approved?

Issue WaterPermit

1.

2.

7. 8.

9.

10. 11. 12.

13.

14.

15.

16.

17.18.Yes

No

No

Yes

No

Yes

Yes

Page 47: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-5-5

Note: Values in ( ) indicate staff number/position.

Policy and

Program WaterRight

Water Utilities

Monitoring and

Enforcement

Administrative and

Financial Engineer 10 4 - 11 - Special investigator - 5 - - - Planning officer 1 - - - - Development management officer

- - - 2 -

Instrument technician - - - 4 - Information analyst 3 - - - - Statistician 1 - - - - Economist 3 - - - - Financial analyst - - 3 - - Regulation officer - - 7 - - Attorney - 1 - - - Administrative 4 3 2 1 30 Total (95+8=103)

22 13 12 18 30

Annex-F 5.3.2 Organization Chart of Present NWRB as of March 2009 Source: NWRB

Board of Director

Office of ExecutiveDirector

(8/9)

Policy and Program Division

( 22 / 26 )

Water Right Division ( 13 / 18 )

Water UtilitiesDivision(12 /15 )

Monitoring andEnforcement

Division (18 /25 )

Administrative andFinancial Division

( 30 / 33 )

Policy and Formulation Section

Permit Section

Registration andLicensing Section

Operation andMonitoring Section

General Service Section

Program Evaluation and Coordination

Complaint and Investigation Section

Water RateRegulation System

Water MeterCalibration Section

Personnel and Records Section

Water Resources Assessment and Section

Evaluation Section

Litigation andAdjudicationSystem

Enforcement Section

Budget and Accounting Section

Water Resources Information Section

Litigation and Adjudication Section

Systems andAccounts Section

Evaluation Section Collection and Disbursement Section

Page 48: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-5-6

Source: Proposal to DBM, NWRB

Annex-F 5.3.3 NWRB’s Proposed Organizational Structure as of March 2009

Page 49: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-5-7

Annex-F 5.3.4 NWRB's Proposed Organizational Structure, September 2010

Office of the Executive Director/Deputy Exec. Director Staff

Management Information System Staff

Internal Audit Staff

Public Affairs Information Staff

Note: Note:

FinancialMonitoringSection

TariffRegulationSection

NWRB BOARD

Financial & Administrative Office

Office of the Deputy Executive Director

Office of the Executive Director

Composed of poolof lawyers,LLB graduates andstenographers

Legal Division

Legal & AdjudicationService

Policy, Coordination &Integration Service

Resource RegulationService

Composed of poolof lawyers, LLBgraduates andstenographers

Economic RegulationService

Adjudication DivisionPolicy and Program

Division

River BasinDevelopment

Division

Water RightsDivision

Standards &Compliance Division

TechnicalRegulation Division

Financial RegulationDivision

PolicyFormulationSection

Assessment &Water PricingSection

Human Resources Management & Records Section

Finance Section

Treasury Section

General Services Section

StandardsMonitoringSection

ReservoirRegulation andMonitoringSection

TechnicalInvestigation &EnforcementSection

Registration &LicensingSection

TechnicalOperationsSection

Consumer Affairsand ComplianceSection

ProjectManagementSection

River BasinInstitutionalDevelopmentSection

River Basin ProjectPlanning &ImplementationSection

River BasinCapacity Dev'tSection

PermitSection

TechnicalEvaluationSection

ProgramEvaluation &CoordinationSection

Page 50: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …
Page 51: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-6-1

Annex-F 6.5.1 Land Classification vs. Land Cover Over Forest Lands in the Study Area 2005

Page 52: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-6-2

Annex-F 6.7.1 Evaluation of Groundwater Usage Condition in Present Condition (2008)

Page 53: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-6-3

Annex-F 6.7.2 Evaluation of Groundwater Usage Condition in Future Condition (2025)

Page 54: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …
Page 55: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-12-1

Annex-F 12.4.1 Organization Structure of Regional Development Council of Region III

RGC-MC: Regional Government Center Management Committee RKCG: Regional KALAHI Convergence Group RLUC: Regional Land Use Committee RPC: Regional Productivity Committee RPMC: Regional Project Monitoring Committee RSCC: Regional Statistical Coordination Committee PDAC: Project Development Assistance Committee

Source: Handbook of the Regional Development Council III (RDC III) Central Luzon Region, Revised August 2006, p26 & pp. 1-25

SCDA SCED SCID SCSD

RGC-MC §4.4

RPMC §4.8 RKCG

§4.5 RSCC §4.9 RLUC §4.6 PDAC §4.10 RPC §4.7

Balik MacArthur Solid Waste Mgmt

All provincial governors and city mayors, mayors of municipalities designated as provincial capitals,

and mayors of municipalities designated as regional center;

All presidents of the provincial league of mayors

RDC III Full Council

The Regional Directors of agencies represented in the National Economic and

Development Authority Board (NEDA, DAR, DA, DBM, DENR, DOF, DFA,

DOH, DILG, DOLE, DPWH, DOST, DTI, DOTC, BSP) and the Regional Directors

of DECs, DSWD and DOT. Secretary

Accredited private sector based in the

region

Private Sector Public Sector

Accredited NGOs based in the region

LGUs: The provinces of Tarlac, Nueva Ecija, Pampanga, Zambales, Bulacan and Bataan, and the cities of Angeles, Cabanatuan, Olongapo, Palayan and San Jose (Nueva Ecija) with San Fernando, Pampanga as the Regional Center.

Regional Line Agencies (RLAs): NEDA, DTI, DA,

DAR, DENR, DPWH, DepEd, TESDA, NIA

RDC III Full Council

Executive Committee

Advisory Committee

Sectoral Committees

Special Committees

Task Forces

§4.3

§4.1

§4.2

SECCOMs

members

SC: Sectoral Committee DA: Development Administration ED: Economic Development ID: Infrastructure Development SD. Social Development

Page 56: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-12-2

Source: RBCO-DENR, January 2010

Annex-F 12.4.2 RBO under of RBCO and Satellite RBCO, Manila Bay Site Coordination Committee

DENR Secretary

Undersecretary

Assistant Secretary for RBO

Executive Director RBCO

NWRB

FMB (Forest Management Bureau)

LMB (Land Management Bureau)

MGB (Mine and Geosciences Bureau)

PAWB (Protected Areas and Wildlife Bureau)

EMB (Environmental Management Bureau)

ERDB (Ecosystems Research and Development Bureau)

Region I Region II Region III Regional Executive

Director

Region XIII

FMB EMB PAWBMGB

RBCO - PMO

RBO RBO

River Basin Site Coordination Committee

FMB EMB PAWB MGB LMB

RBCO - PMO

RBCO: Manila Bay Site Coordination Committee

RBO Pampanga(Proposed)

RBO DENR DPWH DADILG

NIA

(satellite)

(satellite)

Chairman

NCR Region IV-A

Manila Bay RBCO

ERDB

Page 57: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-12-3

Seccoms

Secretariat(NEDA III)

RegionalDevelopment Council

(RDC) III

River BasinsCommittee

Policy & Coordination

GOCCs

LGUs RLAs

ExecutingUnits

RegionalDevelopment Council

(RDC) III

SCSDSCID SCED SCDA River Basins Committee

Provincial RiverBasin

Sub-committees

River Basins Committee(Chair: Provincial GovernorMembers: Provincial governors, Regional Directors of the Technical Secretariat, NGOs, Pos, Private Sector, etc.)

Provincial RiverBasin

Sub-committees

Technical Secretariat(NEDA, DENR, NWRB, DPWH, DOH, etc.)

Policy-making & InvestmentCoordination

The relationship of the RDC III – RBC

vis-à-vis the regular frontline agencies

Roles & Functions: Policy coordination & Decision-making body in the region: Formulation of development plans & Investment Programs; Project monitoring; Budgeting & investment programming

Roles & Functions: Formulation of agency plans and programs; Implementation of plans and programs

Annex-F 12.4.3 Proposed creation of a Committee on River Basins under the Regional Development

Council (RDC) III

Page 58: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

ANF-12-4

Note: PRBC and EC are multi-sectoral, led by the Chair, a representative of LGUs in

Region III.

A representative of PRBC or EC is elected by the member of PRBC and EC

respectively

Source: JICA Study Team

Annex-F 12.4.4 Independent Pampanga River Basin Council

Pampanga River Basin Council (PRBC)

Executive Committee (EC)

Financial and Administrative Office Secretariat

TWG for monitoring water rights regulation and enforcement (surface water and groundwater)

Chair – NWRB Co-Chair – a representative of LGUs

TWG for monitoring water quality, ecosystems and sanitation

Chair – DENR Co-chair – a representative of LGUs

TWG for monitoring watershed and forest management

Chair – DENR Co-chair – a representative of LGUs

TWG for collecting O&M costs for the council, river facilities and monitoring facilities

Chair – DBM Co-chair – a representative of LGUs

TWG for monitoring O&M of river facilities for flood control

Chair – DPWH Co-chair – a representative of LGUs

Page 59: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …

AN

F-12-5

Source: JICA Study Team

Annex-F 12.4.5 Position of NWRB for Water Rights Regulation among RBCO and RBO

(LGUs)

NWRB

Office of the Executive Director Deputy Executive Director

Policy, Coordination & Integration Service

Resource Regulation Service

Economic Regulatory Service

Policy & Program Division

River Basin Development

Division

Water Rights

Division

Standards Compliance

Division

Technical Regulation Division

Financial Regulation Division

NIA, LLDA, Selected WDs, Selected RBOs

(deputize water permit acceptance and monitoring)

Alternative-2: Deputize water Permit acceptance & monitoring

RBO Pampanga (Proposed)

Alternative-1

O&M of River facilities(Alternative-2)

RDC Region III

Regional Office

DENR RBCO

Other Agencies

DPWH

Regional Office

District Engineer’s

Office

Provincial Infrastructures

(Roads, Utilities, flood control,

Irrigation, etc.)

O&M of River Facilities

(Alternative-1)

PMO

FMB

Direct Issue of Water Permit

Manila Bay Site Coordination Committee

Page 60: Annex-Figures - JICAANF-2-5 0 Bustos Weir Bayabas R. Angat R. Angat Dam Ipo Dam 16.5 Labangan Floodway 45.5 56.1 83.1 91.1 Angat R. 0 37.9 152.7 ANG01 ANG02 ANG03 Note: …